Title Page
-
Client / Site
-
Conducted on
-
Prepared by
-
Document No.
Shop Unit Fire System Commission report
-
Name of unit
-
Unit number
-
Unit node , loop , address
-
Has a new fire panel been installed
-
Name of installing company
-
What make is the fire panel that has been installed
-
New batteries installed
-
Correct fuse spur installed in accordance with BS5839
-
Is a zone check installed
-
Tested fire Signal from unit to control room
-
Correct unit name and number Received at control
-
Fault Signal checked to control room .
-
Fire Signal overrides fault Signal
-
Sprinkler tamper valve checked for operation
-
Sprinkler tamper valve closed Signal Received at control room
-
Sprinkler flow switch operation checked
-
Zone check operation satisfactory
-
Bells installed and not electronic sounders
-
Beacons installed at front and rear of store
-
Bells operate correctly on Signal from landlord
-
Beacons operate correctly , <br>Continue to flash after silence has been pressed<br>Do not flash on Signal from landlord
-
Is there a zone chart fitted
-
Zone allocation been marked on fire panel
-
Minimum of 1 manual call point checked per zone (except voids)
-
Tyco engineer signature
-
Customer signature