Job Specific HSSE Audit

  • 1. The SPI JHA / Task Planner / EAP was completed for the job audited (Job being performed). . .

  • 2. All elements of the JHA were completed per policy and job assignment - No blank areas noted. .

  • 3. All crew members assigned to specific task were signed onto the JHA. . .

  • 4. All contact information was completed including emergency contact information. . .

  • 5. Was evacuation location communicated to employee?

  • 6. Crew members audited understood job assignment, site requirements, and job hazards. . .

  • 7. Safety requirements of the JHA were being met - Including barricade tape, overhead work posted, material handling requirements, and hazards were communicated to other crafts

  • 8. Job walk (Review) confirmed all hazards were addressed on the JHA

  • 9. PPE requirements were outlined, understood, and were being met

  • 10. Was lockout / tag out required for job assignment?

  • 11. Did all crew members lock on, sign on, as part of the lockout / tag out requirement? . .

  • 12. Was CSE required for job assignment?

  • 13. Were hazards communicated to crew members?

  • 14. We're all elements of CSE in place and being followed? (Permit, testers, entry log). . .

  • 15. Was scaffold being built per Solid Platforms structural requirements/OSHA standards? . .

  • 16. Are plank sills laid beneath racks on grading / cat walks to distribute weight / avoid point-loading? . .

  • 17. Is staging platform outfitted with toe-board, and orange mess for falling object protection, or fully decked and pans set on edge against vertical uprights and wired to prevent materials from falling?

  • 18. Are elevated staged materials organized and separated so erectors can pull components from staged piles without upsetting other piled materials?

  • 19. Walkways & work platforms provided with a clear path "to do the work" so erectors don't have to climb over materials.

  • 20. Are unused staged elevated materials stacked neatly and secure at the end of shift as to not be toppled after hours from inclement weather or other similar events?

  • 21. All crew members tools tethered per SPI policy?

  • 22. All company vehicles being used on site have daily vehicle inspections completed?

  • 23. Are all Employees and safety lock labels legible?

Job Audited

Corrective Actions

  • Enter corrective actions taken or to be taken by item number (i.e. 1, 2, 3....)

Crew Audited

  • Include names of all crew members

Foreman Signature

  • Foreman Name

General Foreman Signature

  • General Foreman Name

Auditor Signature

  • Auditor Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.