Information
-
Engineer name
-
H.S.A name
-
Customers Address
-
Job Number
-
Conducted on
-
Visit Completed By
Van safety
-
Is the ladder register completed/in date & roof ladder equipment in good order
-
Are power tools in date/good condition
-
Is the cab and van clean/tidy
-
Is the van positioned, parked safely
Safety and Compliance
-
Have the gas docs been updated?
-
Has the property been protected correctly?
-
Have safety warning signs/labels been used and in correct positions?
-
Have the electrics been isolated correctly?
-
PPE in property and complete?
-
Is the engineer using good safe working practices ?
-
Are rcd devices being used where needed ?
-
Is engineer work wear clean and in good condition ?
-
All tools PAT tested?
-
Waste bagged and sited correctly?
-
Comments on safety and compliance
Sales compliance
-
Is all paperwork complete and correct?
-
Has asbestos been identified correctly?
-
Is the specification correct?
-
Comments on the sale and notes
Picture section
-
Boiler
-
Flue
-
Condense
-
Airing Cupboard
-
Gas docs
-
Property Protection and Signs
-
PPE and PAT testing
-
Electric Isolation
-
Install Notes
-
Waste
-
Van