Title Page

  • Document No.

SUPERVISOR INTERNAL AUDIT CHECKLIST FOR ASBESTOS TASK SHEET WORK

  • Job Number

  • Date of Job

  • Address
  • Type of Work

  • Trade Staff on Site

CHECKLIST

  • Was asbestos identified as part of a survey that was carried out? If yes, please provide details of type and location.

  • Comments

  • Had the trade staff, who attended site, received Asbestos Awareness & specific Task Sheet Training?

  • Was the resident made aware, detailing the work which was to be carried out?

  • Were 2 trade staff required on site to do the work?

  • Were face fit certs on site?

  • Were task essential certs on site?

  • Was the door to the work area closed with warning notices on the door?

  • If there is no door present, was the door double flapped with polythene?

  • Did the trade staff prepare and polythene the work area, including work surfaces, before work commenced?

  • Were the trade staff wearing Type 5 particulate protection blue disposable coveralls, half mask respirator with P3 filter and overshoes?

  • Did the trade staff use stepladders or hop ups for the work? If so, please provide details.

  • Details:

  • Was the area to be worked upon dampened down using a wetting agent?

  • Did the trade staff use a dust mate collection tool with a HVAC Hoover if drilling was required?

  • If the trade staff removed floor tiles, did they gently lift the tiles to avoid breakage using a scraper or shovel? If not, please explain the method used.

  • Was the work conducted safely without creating unnecessary dust or debris?

  • Was any Asbestos, which was not collected by the HVAC Hoover, double bagged and taped up?

  • Does HVAC Hoover have an in date service inspection sticker attached?

  • Was the Risk Assessment / Plan of Work followed? Does the work show that control measures in place were used?

  • Was there any uncontrolled release of Asbestos? If yes, please advise on the emergency action that was followed.

  • Emergency Action followed:

  • Were the trade staff coveralls and the polythene correctly bagged and taped?

  • Did the trade staff correctly double bag and Asbestos waste along with a consignment note?

  • Did Asbestos contractors collect the Asbestos waste from the property?

  • Additional Comments

  • Post inspection completed by:

IA-04-41

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.