Information

  • Document No.

Site Name

Building Name

  • Conducted on

  • Prepared by

  • Personnel

LEVEL 1 SURROUNDS

  • Bins

  • Walls

  • General rubbish

  • Drinking Fountains

DDA CHANGE ROOM LEVEL 1(SPP-01, RM101)

  • Walls

  • Floor

  • Bins

  • Mirrors

  • Sink

  • Drain

GROUP TOILETS (SPP-01, RM102)

  • Walls

  • Toilets

  • Bins

  • Mirrors

  • Floor

  • Sinks

  • Drains

CHANGE ROOM 1 (SPP-01, RM104)

  • Walls

  • Floor

  • General rubbish

  • Bins

  • Mirrors

  • Sinks

  • Toilets

  • Showers

  • Drains (hair, lint etc)

CHANGE ROOM 2 (SPP-01, RM105)

  • Walls

  • Floor

  • General rubbish

  • Bins

  • Mirrors

  • Sinks

  • Toilets

  • Showers

  • Drains

CHANGE ROOM 5 (SPP-01, RM106)

  • Walls

  • Floor

  • General rubbish

  • Bins

  • Mirrors

  • Sinks

  • Toilet

  • Showers

  • Drains

CHANGE ROOM 7 (SPP-01, RM107)

  • Walls

  • Floor

  • General rubbish

  • Bins

  • Mirrors

  • Sinks

  • Toilets

  • Showers

  • Drains

CLEANER'S ROOM (SPP-01, RM109)

  • Floor

  • General

UMPIRES CHANGE ROOM (SPP-01, RM110)

  • Walls

  • Floor

  • General rubbish

  • Bins

  • Mirrors

  • Sinks

  • Toilets

  • Showers

  • Drains

CHANGE ROOM 8 (SPP-01, RM111)

  • Walls

  • Floor

  • General rubbish

  • Bins

  • Mirrors

  • Sinks

  • Toilets

  • Showers

  • Drains

CHANGE ROOM 6 (SPP-01, RM112)

  • Walls

  • Floor

  • General rubbish

  • Bins

  • Mirrors

  • Sinks

  • Toilets

  • Showers

  • Drains

CHANGE ROOM 4 (SPP-01, RM113)

  • Walls

  • Floor

  • General rubbish

  • Bins

  • Mirrors

  • Sinks

  • Toilets

  • Showers

  • Drains

CHANGE ROOM 3 (SPP-01, RM 114)

  • Walls

  • Floor

  • General rubbish

  • Bins

  • Mirrors

  • Sinks

  • Toilets

  • Showers

  • Drains

FIRST AID ROOM (SPP-01, RM117)

  • Floor

  • Walls

  • Sharps container

  • Bins

  • First Aid Kit Stock

  • Sink

FRONT ENTRANCE AND STAIRWELL (SPP-02, RM117)

  • Floor

  • Walls

  • Lift (Stainless Steel)

  • General rubbish

LEVEL 2 SURROUNDS AND BACK STAIRWELL (SPP-02, RM207)

  • Floor

  • Walls

  • Bins

  • General rubbish

CLUB ROOM 1(SPP-02, RM201)

  • Floor

  • Glass

  • Walls

  • Kitchen

  • Bins

CLUB ROOM 2 (SPP-02, RM206)

  • Floor

  • Glass

  • Walls

  • Kitchen

  • Bins

LEVEL 2 DDA CHANGE ROOM (SPP-02, RM205)

  • Floor

  • Walls

  • Mirror

  • Sink

  • Toilet

  • Bins

FUNCTION ROOM (SPP-02, RM203)

  • Carpet

  • Walls

  • Stainless floor caps

  • Glass

  • Bins

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.