Title Page
-
Client / Site
-
Conducted on
-
Prepared by
Chlorine Dosing System / Emergency Shut Off System
-
Dosing Unit (not in alarm, automatic mode)
-
Chlorine injector line (breaks, leaks air trapped in line)
-
Chlorine Cylinders (chained and secured)
-
Fan operational
-
Door latch secured and open
-
Chlorine Dosing Pump Inspection (noise, visual and smell)
-
Air Cylinder Gauge (in range on gauge)
-
Check tubing for leaks (mist or hiss)
-
Hydra Sentinel Unit System Check (powered, alarms, battery)
-
Test Emergency Shut Off System
Chemical Storage Area
-
Dump Shower / Eye Wash Station operational
-
PPE available, good condition and appropriately stored (Glasses, boots, apron, glasses, mask, gloves)
-
Chemical Spill Kit
-
Chemical Storage (Bunding, sufficient distance)
-
Floor tidy (remove trip hazards)
Chemical Stores
-
Cylinder 1 (kg remaining) *If both cylinders below 20kg order should be placed.
-
Cylinder 2 (kg remaining)
-
Sodium Bicarbonate (20kg)
-
Sodium Bisulphate (20kg)
-
Rock Alum (20kg)
-
Calcium Chloride (20kg)
-
Sodium Hypochlorite (10L)
-
Hydrochloric Acid (10L)
-
Calcium Hypochlorite (10kg)
Filtration System
-
Filter 1 (kPa pressure gauge)
-
Filter 2 (kPa pressure gauge)
-
Filter 3 (kPa pressure gauge)
-
Pump Inspection (noise, visual and smell)
-
Balance Tank inspection (levels, outlets)
-
Strainer Basket (empty if required)
Mechanical Systems
-
Heating, ventilation and air conditioning (HVAC) systems operating (check heat upstairs)
Electrical Systems
-
Switch board inspection (not tripped fuse, exposed wiring etc).
-
Lighting
SI Index
-
Ph + TF + CF + AF - TDS = S.I. INDEX
-