Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location/ Circuit

  • Loading Unit

  • Outgoing Crew

  • Incoming Crew

  • Are there truck park up locations on Pit floor

  • Last Load Time

  • Outgoing operators leave in LV - time

  • Incoming operators arrive in LV - time

  • First Load Time

  • Time loaded trucks left: (Assuming loaded trucks at pit floor)

  • Time first truck arrived to be loaded

Shift Change Process

Execution Quality - Start of Shift

  • Was crew ready to board bus? or to attend prestart at 5:30am/pm?

  • Was Prestart performed at go-Line?

  • Did Operator proceed directly to allocated equipment post prestart (In-Pit or Go-Line)

Engagement - IROC

  • Did outgoing crew follow park-up assignments?

  • Was the correct delay entered at the end of shift for all equipment? (Outgoing Crew)

  • Was the correct delay entered at the start of shift for all equipment? (Incoming Crew)

Feedback / Issues

  • Any Additional Feedback Required?

Actions

  • Actions related to process

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.