Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location/ Circuit
-
Loading Unit
-
Outgoing Crew
-
Incoming Crew
-
Are there truck park up locations on Pit floor
-
Last Load Time
-
Outgoing operators leave in LV - time
-
Incoming operators arrive in LV - time
-
First Load Time
-
Time loaded trucks left: (Assuming loaded trucks at pit floor)
-
Time first truck arrived to be loaded
Shift Change Process
Execution Quality - Start of Shift
-
Was crew ready to board bus? or to attend prestart at 5:30am/pm?
-
Was Prestart performed at go-Line?
-
Did Operator proceed directly to allocated equipment post prestart (In-Pit or Go-Line)
Engagement - IROC
-
Did outgoing crew follow park-up assignments?
-
Was the correct delay entered at the end of shift for all equipment? (Outgoing Crew)
-
Was the correct delay entered at the start of shift for all equipment? (Incoming Crew)
Feedback / Issues
-
Any Additional Feedback Required?
Actions
-
Actions related to process