Site conducted
-
Type of Temporary Works Inspected
-
Document No.
-
Site Name
-
Client
-
Conducted on
-
Prepared by
1. Design Documents
-
1.1 Is a Compliance Sheet Available?
-
1.2 Is a Design Drawing and Calculations Available?
-
1.3 Summary of comments / actions
2. Handover Documents
-
2.1 Is a Handover Certificate Available?
-
2.2 Summary of comments / actions
3. Ties
-
3.1 How is the scaffolding tied (Through Tie / Reveal Tie / Box Tie / Cast In Drilled Anchorage / Returns / Buttress / Rakers)?
-
3.2 Do the ties match the compliance sheet or design drawing?
-
3.3 Drilled Anchorage do you have copies of Pull Test Results / Calibration Certificate for Tester / Training Records of User?
-
3.5 Have correct No. of ties been installed?
-
3.6 Have ties been installed with RH angled (load bearing) couplers?
-
3.7 Have 5% (minimum 3) ring bolt ties been tested?
-
3.8 Are rakers correctly installed?
-
3.9 Are ties installed to both inner and outer standards and ledgers?
-
3.10 Summary of comments / actions
4. Scaffolding Structure Foundations
-
4.1 Are the Foundations Level and Firm?
-
4.2 Are the Soleboards Correctly Installe ?
-
4.3 Are the Baseplates Correctly Installed?
-
4.4 Summary of comments / actions
5. Scaffolding Structure Geometry
-
5.1 Are the Standards Plumb?
-
5.2 Are the Ledgers / Transoms Horizontal?
-
5.3 Are the Joints / Ledgers staggered (not in same bay)?
-
5.4 Are the Joints in Ledger less than 1/3rd in each bay?
-
5.5 Are the Transoms correctly spaced?
-
5.6 Summary of comments / actions
6. Scaffolding Structure Bracing
-
6.1 Is Facade bracing fitted to every lift?
-
6.2 Is Facade bracing installed to correct No. of Bays?
-
6.3 Is Façade brace correct distance from node point?
-
6.4 Is the Ledger bracing fitted on alternate pairs for full scaffold height?
-
6.5 Summary of comments / actions
7. Scaffolding Structure Access / Egress
-
7.1 Is Access to full scaffold height?
-
7.2 Is Ladder at correct angle 70 degrees?
-
7.3 Ladder extends 1m above each platform?
-
7.4 External ladder gates fitted to platform?
-
7.5 Internal ladder hatches fitted to platform?
-
7.6 Is ladder securely fastened?
-
7.7 Summary of comments / actions
8. Scaffolding Structure Working Platform
-
8.1 Do boards extend to safe distance beyond last support?
-
8.2 Are boards sound / in good condition and conform to BS 2482?
-
8.3 Are boards secured?
-
8.4 Any gaps in working platform (none permitted)?
-
8.5 Is platform correct for purpose used?
-
8.6 Summary of comments / actions
9. Scaffolding Structure Tubes and Fittings
-
9.1 Are tubes in good condition?
-
9.2 Are fittings in good condition?
-
9.3 Are fittings secured?
-
9.4 Summary of comments / actions
10. Scaffolding Structure Loading
-
10.1 Are standards at correct spacing for intended use?
-
10.2 Are any materials stored unevenly on platform?
-
10.3 Are materials stacked on platform secure?
-
10.4 Summary of comments / actions
11. Scaffolding Structure Guardrails and Toeboards
-
11.1 Are guard rails installed to correct height > 950mm top guard rails <470mm intermediate?
-
11.2 Are guard rails installed with correct fixtures?
-
11.3 Are toe boards at correct height?
-
11.4 Are brick guards fitted?
-
11.5 Are transoms correctly spaced?
-
11.6 Summary of comments / actions
Summary
-
Please note any items that have not been previously covered.
-
Scaffolding Inspector / Temporary Works Coordinator
-
Site Representative