Information

  • Document No.

  • Reference Number

  • Branch Title

  • Branch Number

  • Site Contact

  • Conducted on

  • Prepared by

Works

  • General Description of the works

  • Permits Needed

Please add tasks below which are required

Please also fill out Window and Door sections if necessary

  • Work Neccessary

  • Task
  • Description of Task

  • Photos of Area of Work

  • Task specific measurements

  • Drawing if Neccessary

  • Trade Needed

  • Scaffold Needed

  • Photo of Scaffold position

  • Estimated Height

Doors

  • Are there Doors to replace

  • Door Details

  • Door
  • Measurements and Description

  • Photo of existing door and position

  • Door Material

Windows

  • Are there Windows to replace

  • Window Details

  • Window
  • Measurements and Description

  • Photo of existing window and position

  • Window Material

Confirmation

  • By signing below you acknowledge that a representative of Woofenden Construction has discussed with you the Work Tasks within this report.

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.