Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Site information

  • Survey date

  • Surveyor Name

  • Building

  • Floor

  • Comms Room Name

  • Any Special Access Requirements

  • ACM Status

  • Location pictures

  • Take photo of location

  • Approx Room Dimensions

Cabinets

  • How many Cabinets

  • Type / Size of Cabinets

  • Information

  • Take photo of each cabinet front & Rear if possible

  • Plinth/Stage required?

  • Size of Plinth /Stage

  • New cabinet specified?

  • Are above Suitable including Footprint

  • If Wall Mount, State Wall Structure/ Fixing required

  • Cabinet labelling Scheme

PDU's

  • How Many Existing PDU's

  • State Size & Type

  • Are they hard wired in?

  • New specified PDU's

  • Are the above suitable

Power

  • Type of existing power sockets

  • New specified power sockets

  • Quantity

  • No of power sockets

Bonding

  • Are there enough existing earth bonds?

  • If No how many are required?

Containment

  • What containment is required for new position/ cabling

  • Vertical quantity and type

  • Horizontal quantity and type

Cabling

  • How many Cat5/5e cables enter room?

  • is above approximate ?

  • What is the Cat5/5e split?

  • is above approximate ?

  • Is Cat5/5e separate in looms?

  • Take photo of cable path into room

  • Are any cables flagged to be removed?

Fire stopping

  • Is Fire stopping required?

  • Take photo of incoming penetrations

  • State new Fire stopping requirements

Patch Panels

  • How many existing 24 way non krone cat5 PCB panels?

  • How many existing 24 way krone PCB panels?

  • How many existing 24 way non krone modular panels?

  • How many existing 24 way krone modular panels?

  • How many existing 48 way non krone cat5 PCB panels?

  • How many existing 48 way krone PCB panels?

  • How many existing 48 way non krone modular panels?

  • How many existing 48 way krone modular panels?

  • How many existing 24 way krone Panels are required?

  • How many existing 48 way krone Panels are required?

  • Existing labelling scheme

  • Are there any obvious specific non data ports?

  • CCTV qty?

  • Voice and qty

  • Access control and qty?

  • Will there be issues with above at cutover weekend?

  • Are highlands required?

  • If Yes how many circuits?

  • Take photo of proposed HiBand location

Switches

  • How many existing switches?

  • State type & Port quantity?

  • New switch quantity?

  • Take photo of switches

Patch Leads

  • New patch leads requirements

  • New patch leads requirements

  • New patch leads requirements

Fibre

  • Is Fibre present?

  • What type of fibre panels

  • What fibre type

  • Existing fibre labelling scheme?

  • Source location

  • Survey and specify source location

  • What fibre panels at source location?

  • What fibre type at source location

  • Are new fibre patch leads required if Yes what type ?

Copper backbone

  • Are copper backbones present?

  • What cable

  • What panels

  • Existing labelling scheme

  • Source location

  • Survey and specify source location

  • What cable

  • What panels

Materials

  • Are there any extra parts required in addition to those specified

20% for expansion?

  • Will the rework achieve this?

  • If No what changes will be required to scope?

Labour resource

  • How many days will the upgrade take?

  • If works to be split over multiple weekends state plan?

General site Conditions

  • Is parking available at the building location? State location

  • Any special unloading condition at location? Please specify

  • Has a temp storage location been identified?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.