Title Page

  • Conducted on

  • Job Number

  • Prepared by

  • Line

  • Supplied Drawings

Chassis, 1st fix plumbing and deck.

  • Center lugs equal over both halves.

  • Boarding as specification

  • Evidence

  • Pressure Test. Pre Decking

  • Evidence

  • Pressure Test. Deck Down.

  • Evidence

  • Radiator Pipework As Spec. Location And Size

  • Evidence

  • Pipework Defined Hot+Cold

  • Evidence

  • Open Ends Of Pipework Sealed

  • Evidence

  • Flow And Return Defined

  • Evidence

  • Condition of fixing points. Timber and Fixings.

  • Evidence

  • Coach Bolts Secure To Chassis

  • Evidence

Stage 2. Superstructure post roof

  • Velux fitted

  • Window Liners fitted

  • Evidence

  • Ceiling running level, in line.

  • Evidence

  • Fire Place fitted and boarded

  • Cuts And Halvings

  • Evidence

  • Condition Of Timber

  • Evidence

  • Openings. Dimensions And Square

  • Location as per drawings

  • Internal And External Walls Square, Level And Plumb

  • Location as per drawings

  • Wall Plate Condition

  • Evidence

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.