Title Page

  • Site conducted

  • Project / Client:

  • Site:

  • Checklist no.

  • Inspection by:

  • Date/Time

  • Section

  • Element of Works:

  • Show Plan of Works

  • INSPECTION STAGE

1: Setting out for Excavation

  • Setting out checked

  • Checked by:

2: Trench Formation/Stability

  • Check trench formation/stability

  • Comments and action required:

  • Checked by

  • Signed

  • Date.

3: Pipe Bedding Depth & Type

  • Confirm Specification

  • Gravel Size:
  • Is Geotextile as specified

  • Checked by:

  • Signed:

  • Date

4: Line & Level of Pipe

  • Are Line and level correct

  • Checked by:

  • Signed:

  • Date:

  • Have adjustments had to be made due to obstructions or site features

  • What has caused change to line or level

5: Testing

  • Is testing required, if so type:

  • Test:

  • Checked by:

  • Signed:

  • Date:

6: Backfill & Compaction

  • Are suitable materials used

  • Checked by:

  • Signed:

  • Date:

  • What action is required

7: Marker Blocks, Tapes and Location Posts

  • Are specified markers in position

  • Checked by:

  • Signed:

  • Date:

8: Final Inspection & Testing

  • Final Inspection & Testing Completed

  • Inspection Type (To be established from Specification)

  • Undertaken by:

  • Signed:

  • Date:

9: As-Built Plans

  • Survey taken

  • As Built Plan for section checked

Final Pipework Section Approval MJA

  • All works to section completed to design & specification

  • Comments

  • Completed by:

  • Signed:

  • Date:

Final Sign Approval by Main Contractor

  • All works completed to design & specification

  • Comments:

  • Completed by:

  • Signed:

  • Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.