Information

  • Audit Title

  • Document No.

  • Client:

  • Site:

  • Conducted on

  • Prepared by

  • Site Area Location

  • Site Area Description

  • Plan Location

1. General Condition

  • Does the area require any vegetation management prior to works

  • Does it require Herbicide Application

  • Does it require Cutting

  • Does it require Cultivation and Grading

  • Please describe

  • Has the area been left clean, tidy and well kept by others

  • Is there waste, rubbish or materials left by others

  • Please describe

  • Provide photographic evidence

  • Provide location
  • Is there any Damage that requires repair?

  • Please describe Damage fully including locations

  • Please describe remedial actions required

  • Please show damage here

  • Are there any excavations or spoil heaps left by others?

  • Describe and estimate volume

  • Add media

  • Mark approx location
  • Have excavations been backfilled to specification and acceptable standard?

  • Describe condition and required remedial works.

  • Is there suitable access for the required task

  • Is adequate storage area provided for the task

  • Work area is free of obstructions and slip resistant

  • Are there any other Risks or Factors that may affect the works

  • Please describe

  • Add media

  • Give location
  • Are there other Contractors working in or accessing through the work area

  • Will they be affected by the works

  • Describe how

2. Services, Structures and Existing Infrastructure

  • Have Service Plans been provided

  • Has a CAT scan been undertaken

  • Are there any Overhead or Buried Services in or near the work area

  • Are these demarcated and Crossing Points to GS6 or other in place

  • Are the proposed works affected by or within GS6 or other easement distance

  • Are any works to be undertaken near roads, paving, kerbs, fences, buildings or other structures

  • What protective measures will be required

  • Are any works to be undertaken near to hedges, trees established or new grass or any other landscaped area

  • What protective measures will be required

Acceptance of Work Area

  • Is the area acceptable for hand over for works to begin

  • Action required to make it acceptable

  • Signed:

  • Date

  • Area accepted by

  • Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.