Information
-
Audit Title
-
Document No.
-
Client:
-
Site:
-
Conducted on
-
Prepared by
-
Site Area Location
- Gate 1
- Gate 2
- Gate 2.5
- Gate 3
- River
- House Zone 2 & 3
- House Drop Off
- Lake
- Wetland
- Tip
- Cascades
- Marquee Field
- Helipad
- Spiral Mound
- Stables
- EWC 1
- G3 South
- G3 North
- EWC 2
- Service Area
- Walled Garden
- Substation
- Road 1
- Road 2
- Road 3
- Road 4
- Road 5
- Road 6
- Road 7a
- Road 7b
-
Site Area Description
-
Plan Location
1. General Condition
-
Does the area require any vegetation management prior to works
-
Does it require Herbicide Application
-
Does it require Cutting
-
Does it require Cultivation and Grading
-
Please describe
-
Has the area been left clean, tidy and well kept by others
-
Is there waste, rubbish or materials left by others
-
Please describe
-
Provide photographic evidence
-
Provide location
-
Is there any Damage that requires repair?
-
Please describe Damage fully including locations
-
Please describe remedial actions required
-
Please show damage here
-
Are there any excavations or spoil heaps left by others?
-
Describe and estimate volume
-
Add media
-
Mark approx location
-
Have excavations been backfilled to specification and acceptable standard?
-
Describe condition and required remedial works.
-
Is there suitable access for the required task
-
Is adequate storage area provided for the task
-
Work area is free of obstructions and slip resistant
-
Are there any other Risks or Factors that may affect the works
-
Please describe
-
Add media
-
Give location
-
Are there other Contractors working in or accessing through the work area
-
Will they be affected by the works
-
Describe how
2. Services, Structures and Existing Infrastructure
-
Have Service Plans been provided
-
Has a CAT scan been undertaken
-
Are there any Overhead or Buried Services in or near the work area
-
Are these demarcated and Crossing Points to GS6 or other in place
-
Are the proposed works affected by or within GS6 or other easement distance
-
Are any works to be undertaken near roads, paving, kerbs, fences, buildings or other structures
-
What protective measures will be required
-
Are any works to be undertaken near to hedges, trees established or new grass or any other landscaped area
-
What protective measures will be required
Acceptance of Work Area
-
Is the area acceptable for hand over for works to begin
-
Action required to make it acceptable
-
Signed:
-
Date
-
Area accepted by
-
Date: