Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Commencement List
-
Has Curing Time for Concrete Substrate been achieved
-
Substrate Condition is as per Manufacturer Specification
-
Penetrations or Cores Completed
-
Outlets have been cast in as per detail
-
Upstands are complete as per detail
-
Davit Posts or Balustrade Anchor Points have been installed and tested
-
Suitable and Safe Access and Egress Points
-
Edge Protection in Place
-
Peel Tests Required
-
Clear of Standing Water / Dirt and Debris
-
Clear of Obstructions/Plant and Materials
-
Roof Area Clear of Other Trades
-
Deliveries have a clear and accessible zone to offload
-
Means of Loading in Place and Agreed
-
Storage Area available and Agreed
-
Is the Roof Area deemed Acceptable for Contract Works to Begin
Conclusion
-
General Comments
-
TFR Manager Sign Off
-
Main Contractor Sign Off