Title Page
-
Site conducted
-
Location
-
Conducted on
-
Inspected by
-
Job Number
-
Area of Project
-
EIT Inspection carried out
-
Waterproofing passed for Guarantee
-
Roof Cleared
-
Cement Face Insulation installed as per approved designs.
-
Insulation Installed is as per Manufacture and Engineers Specifications
-
Insulation break bonded
-
No excessive gaps between boards
-
Outlet Inspection Chambers installed
-
Water Control layer installed as per Manufactures guidelines
-
Paving Slabs Installed on supports as per Manufactures guidelines and approved details.
-
Ballast installed as per design to designated areas
Summary and Sign Off
-
Summary of findings
-
Inspector Sign Off
-
Client Inspection