Information

  • Job Number

  • Inspection Type

  • Lot Address

  • Conducted on

  • Prepared by

  • Weather Conditions

  • Location

LANDSCAPE VIEW

  • Add media

ENTRY

  • Front door - 0.5

  • Paint top and bottom door - 0.7

  • Paint finish - 0.7

  • Door furniture - 0.5

  • Jamb seals - 0.3

  • Door margins - 0.4

  • Sidelight glazing - 0.5

  • Jambs and sill - 0.4

  • General Comments

  • 4%

ENTRY HALL

  • Floor coverings - 0.5

  • Arcs and skirts - 0.4

  • Plaster - 0.5

  • Coat/linn - 0.4

  • Bulkheads & niche - 0.3

  • Garage door & jamb - 0.4

  • Paint finish - 0.5

  • General Comments

  • 3%

STUDY

  • Paint finish - 0.3

  • Door jambs - 0.2

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Plaster - 0.3

  • Glass and windows frame - 0.5

  • Floor coverings - 0.3

  • General Comments

  • 2.5%

BED 1

  • Paint finish - 0.5

  • Doors and jambs - 0.3

  • Door furniture - 0.2

  • Door margins - 0.2

  • Arcs and skirts - 0.3

  • Plaster - 0.5

  • Glass and window frames - 0.4

  • Floor coverings 0.5%

  • General Comments

  • 3%

WALK IN ROBE

  • Paint finish - 0.4

  • Shelves and rails 0.2

  • Skirts and arcs - 0.3

  • Door jambs and doors - 0.4

  • Door furniture - 0.3

  • Plaster - 0.4

  • General Comments

  • 2%

ENSUITE

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint finish - 0.4

  • Glass and window frames - 0.4

  • Bench tops - 0.3

  • Cabinets and shelves - 0.3

  • Plumbing fit off - 0.3

  • Wall and floor tiles - 0.4

  • Shower screen - 0.3

  • Mirror - 0.3

  • Toilet suite and seat - 0.3

  • Pan secure - 0.4

  • Niche tiling graded fall - 0.2

  • Paint top edges of skirting tiles 0.3

  • Shower base condition - 0.5

  • Plaster - 0.4

  • Bath - 0.5

  • Basin - 0.5

  • General Comments

  • 7%

KITCHEN

  • Bench tops - 0.4

  • Plumbing fit off - 0.4

  • Splash back and tiles - 0.4

  • Cabinets, drawers, doors, shelves - 0.4

  • Plaster - 0.4

  • Arcs and skirts - 0.4

  • Glass and windows frames - 0.5

  • Floor coverings - 0.4

  • Bulkheads - 0.3

  • Paint finish - 0.4

  • Sink - 0.5

  • General Comments

  • 4.5%

BUTLERS PANTRY

  • Bench tops - 0.2

  • Door & Jamb & Furniture - 0.3

  • Plumbing fit off - 0.2

  • Splashback or tiles - 0.2

  • Cabinets, doors, drawers & shelves - 0.2

  • Plaster - 0.2

  • Arcs and skirts - 0.2

  • Glass and window frames - 0.2

  • Floor coverings - 0.2

  • Bulkheads - 0.2

  • Paint finish - 0.2

  • General Comments

  • 2.3%

DINING ROOM

  • Plaster - 0.5

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint finish - 0.5

  • Floor coverings - 0.4

  • Glass and window frames - 0.4

  • Bifolds - Paint top and bottom - 0.3

  • General Comments

  • 3%

FAMILY ROOM

  • Plaster - 0.4

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.4

  • Paint finish - 0.4

  • Glass and window frames - 0.5

  • Floor coverings - 0.4

  • General Comments

  • 3%

RUMPUS

  • Plaster - 0.4

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint finish - 0.4

  • Glass and window frames - 0.5

  • Bifold's painted top/bottom - External sliding doors - 0.5

  • Floor coverage - 0.4

  • General Comments

  • 3%

BED 2

  • Wardrobe fit out - 0.3

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door furniture - 0.2

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint - 0.4

  • Glass and window frames - 0.4

  • Floor coverings - 0.3

  • Plaster - 0.4

  • General Comments

  • 3%

LEISURE/LIVING ROOM

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint - 0.4

  • Plaster - 0.4

  • Glass and window frames - 0.4

  • Floor coverage - 0.3

  • General Comments

  • 3%

REAR HALL

  • Plaster - 0.3

  • Paint finish - 0.3

  • Arcs and skirts - 0.3

  • Linen doors and jambs - 0.3

  • Linen door furniture - 0.3

  • Floor coverings - 0.3

  • Ceiling access, frame and lid - 0.2

  • General Comments

  • 2%

LAUNDRY

  • Doors and jambs - 0.3

  • Doors and margins - 0.3

  • Door furniture - 0.3

  • Arcs and skirts - 0.2

  • Paint finish - 0.2

  • Glass and window frames - 0.3

  • Wall and floor tiles - 0.3

  • Plumbing fit off - 0.2

  • Trough and cabinet - 0.2

  • Paint too edge of skirting tiles - 0.2

  • Plaster - 0.2

  • External door paint top and bottom - 0.5

  • General Comments

  • 3%

WC 1

  • Plaster - 0.2

  • Doors and jambs 0.2

  • Door furniture - 0.2

  • Arcs and skirts - 0.2

  • Door margins - 0.2

  • Paint top edge of skirting tiles - 0.2

  • Glass and window frames - 0.2

  • Paint - 0.2

  • Toilet suite and seat - 0.2

  • Pan secure - 0.2

  • Floor tiling - 0.2

  • General Comments

  • 2.2%

BATHROOM

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint finish - 0.4

  • Glass and window frames - 0.4

  • Bench tops - 0.3

  • Cabinet and shelves - 0.3

  • Plumbing fit off - 0.3

  • Wall and floor tiles - 0.3

  • Shower screen - 0.3

  • Mirror - 0.3

  • Toilet suite and seat - 0.2

  • Pan secure - 0.2

  • Niche tiling graded fall - 0.2

  • Paint top edge of skirting tiles - 0.2

  • Bath condition - 0.5

  • Shower base condition - 0.5

  • Plaster - 0.4

  • Basin - 0.5

  • General Comments

  • 6.5%

BED 3

  • Wardrobe fit out - 0.3

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint finish - 0.4

  • Glass and window frames - 0.4

  • Floor coverings - 0.3

  • Plaster - 0.4

  • General Comments

  • 3 %

BED 4

  • Wardrobe fit out - 0.3

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint finish - 0.4

  • Glass and window frames - 0.4

  • Floor coverings - 0.3

  • Plaster - 0.4

  • General Comments

  • 3%

ENSUITE 2

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint finish - 0.4

  • Glass and window frames - 0.4

  • Bench tops - 0.3

  • Cabinet and shelves - 0.3

  • Plumbing fit off - 0.3

  • Wall and floor tiles - 0.3

  • Shower screen - 0.3

  • Mirror - 0.3

  • Toilet suite and seat - 0.3

  • Pan secure - 0.3

  • Niche tiling graded fall - 0.3

  • Paint to edge of skirting tiles - 0.3

  • Shower base condition - 0.3

  • Plaster - 0.4

  • Bath - 0.3

  • Basin - 0.5

  • General Comments

  • 6.5

POWDER ROOM

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint - 0.3

  • Glass and window frames - 0.3

  • Bench tops - 0.3

  • Cabinets and shelves - 0.3

  • Plumbing fit off - 0.3

  • Wall and floor tiles - 0.3

  • Mirror - 0.3

  • Toilet suite and seat - 0.3

  • Pan secure - 0.3

  • Paint top of skirting tiles - 0.3

  • Plaster - 0.3

  • Basin - 0.5

  • General Comments

  • 5%

GARAGE

  • Slab finish - 0.3

  • Doors and jambs - 0.2

  • Door margins - 0.2

  • Door seals - 0.2

  • Door painted top and bottom - 0.7

  • Door furniture - 0.3

  • Plaster and paint - 0.5

  • Arcs and skirts - 0.2

  • Panel lift or roller door - 1.0

  • General Comments

  • 3%

ALFRESCO

  • Paint finish - 0.5

  • Plaster - 0.5

  • Decking - 0.5

  • Plumbing fit off - 0.5

  • General Comments

  • 3%

PORTICO

  • Paint finish - 0.5

  • Plaster - 0.5

  • General Comments

  • 2%

BRICKWORK / HEBEL

  • Joint bed and perp sizes - 1.0

  • Brick clean - 1.0

  • Mortar color consistency - 1.0

  • 10-15mm window sill clearance - 1.0

  • Brick slab overhang - 0.5

  • A-joints complete - 1.0

  • Paint steel lintels - 0.5

  • Render - Complete and free of damage and marks. - 0.4

  • Hebel - Paving / Dirt clear of underside of Hebel. 25mm minimum clearance.

  • General Comments

  • 6%

AREA GENERAL

  • 12 spare roof tiles - 0.5

  • Riser for HWS overflow is to the left of HWS pad, next to the pad and visible - 0.5

  • Gas pipe lagged - 0.3

  • Paint touch up tins - 0.5

  • External Painting - 0.5

  • Door and window in-fills - 1.0

  • House clean complete - 1.0

  • Site clean complete - 1.0

  • Graded soil away from slab - 1.0

  • AG pipes situated 1500mm of house - 0.5

  • Porches and eaves complete - 1.0

  • Fascia, gutters, valleys - 0.5

  • Roof flashings and downpipes - 1.0

  • Downpipes, rivets to pops - 0.5

  • Paint boots on downpipes - 0.5

  • Roof tiling or colourbond - 1.0

  • Paving quality and finish - 0.5

  • General Comments

  • 11.5%

GENERAL COMMENTS NOT COVERED ABOVE

  • General Comments Not Covered Above

FIRST INSPECTION

  • PASS OR FAIL

  • TOTAL PERCENTAGE SCORE=

  • Signature :

RE-INSPECTION

  • Select date

  • All items complete as per inspection

  • Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.