Title Page
-
Building
-
Area
-
Elevation
-
Works
-
Commencement date
-
Certa Manager
Work installation and inspection
Pre-install checklist
-
Does site have construction issue drawings available?
-
Have project specific calculations & drawings been developed for the system?
-
Is the substructure in line with current system tolerances?
-
Have grid lines and Datum’s provided by HBC?
-
Have any changes in design been approved?
-
Is area clear and accessible?
Installation
-
Type of works
- Corten cladding wall
- Corten cladding roof
- Veio cladding
- Hot melt & paving
- Single ply
- Level 7 plantwell
- Acoustic panels
- Shop Front Tiles
- H2 Cladding
SFS
-
Has SFS been set out to gridline/Datum?
-
Has SFS been installed correctly?
-
Has SFS been checked by Certa Manager?
-
Can next stage of installation be carried out?
-
Evidence
Boards
-
Has correct material been delivered to site?
-
Have liner boards been installed in line with Certa construction issue specs?
-
Have liner boards been checked by a Certa Manager?
-
Can next stage of installation be carried out?
-
Evidence
Breather membrane
-
Has correct material been delivered to site.
-
Has breather membrane been installed inline with Certa construction issue specs?
-
Has breather membrane been checked by a Certa Manager?
-
Can next stage of installation be carried out?
-
Evidence
Brackets
-
Has correct material been delivered to site?
-
Have correct fixings been identified?
-
Have brackets been installed in line with certa construction issue specs?
-
Have brackets been checked by Certa manager
-
Can next stage of installation be carried out?
-
Evidence
Fire barrier
-
Has fire barrier been installed to the latest fire strategy revision?
-
Has fire barrier been installed in line with Certa construction issue specs?
-
Has fire barrier been checked by Certa Manager
-
Can next stage of installation be carried out?
-
Evidence
-
Hold Point Sign off
Duoslab insulation
-
Have correct material been delivered to site?
-
Has Insulation been installed with correct fixings in line with Certa Construction issue specs?
-
Has Insulation been checked by Certa Manager
-
Can next stage of install be carried out?
-
Evidence
Corten panels
-
Has correct material been delivered to site?
-
Have Corten panels been installed in line with Certa construction issue specs?
-
Have Corten panels been checked by Certa Manager?
-
Is area ready for final QA inspection?
-
Evidence
Decking roof & Top Hats
-
Decking installed in line with Certa construction issue specs?
-
Top hats installed in line with Certa construction issue specs?
-
Brackets installed to correct centres?
-
Works checked by Certa Manager?
-
Can next stage of installation be carried out?
-
Evidence
VCL
-
VCL installed in line with Certa Construction issue specs?
-
VCL checked by Certa Manager
-
Can next stage of installation be carried out?
-
Evidence
Duoslab insulation
-
Insulation installed in line with Certa Construction issue specs?
-
Works checked by Certa Manager
-
Can next stage of installation be carried out?
-
Evidence
Bemo panels
-
Bemo panels installed in line with Certa construction issue specs?
-
Works checked by Certa Manager
-
Can next stage of installation be carried out?
-
Evidence
Corten panels
-
Corten panels installed in line with Certa construction issue specs?
-
Works checked by Certa Manager
-
Area ready for final QA checks
-
Evidence
Priming
-
Sopradvance fast curing compound installed?
-
Elastico 500 primer installed?
-
Duoflex compound 1st layer installed?
-
TR200 reinforcement fleece installed?
-
Duoflex compound 2nd layer installed?
-
Sopralene Flam Garden 250 AF cap sheet installed?
-
Priming installation checked by Certa Manager?
-
Can next stage of installation be carried out?
-
Evidence
Insulation
-
180mm Sopratherm XPS SL artic insulation installed?
-
Ecovoid and filter layer installed?
-
Insulation checked by Certa Manager?
-
Can next stage of installation be carried out?
-
Evidence
Paving
-
Paving installed
-
Paving checked by Certa Manager
-
Area ready for final QA checks?
-
Evidence
Decking
-
Has correct material delivered to site?
-
Have decking sheets been installed to Certa construction issue specs?
-
Has decking been checked by a Certa Manager?
-
Can next stage of installation be installed
-
Evidence
VCL
-
Has correct material been delivered to site?
-
Has VCL been installed to Certa Construction issue drawings?
-
Has VCL been checked by a Certa Manager?
-
Can next stage of installation be carried out?
-
Evidence
Insulation
-
Has correct material been delivered to site?
-
Has insulation been installed in line with Certa Construction issue specs?
-
Has insulation been checked by Certa Manager?
-
Can next stage of installation be carried out?
-
Evidence
Single ply
-
Has correct material been delivered to site?
-
Has single ply been installed in line with Certa Construction issue specs and Soprema installation guidelines?
-
Has single ply been checked by Certa Manager?
-
is area ready for final QA inspection?
-
Evidence
undefined
-
Has correct material been delivered to site?
-
Have tiles been installed in line with Certa Construction issue specs?
-
Have tiles been checked by Certa Manager?
-
Is area ready for final QA checks?
-
Evidence
SFS
-
Have correct materials been delivered to site?
-
Has SFS been installed in line with Certa construction issue specs?
-
Has SFS been checked by a Certa Manager?
-
Can next stage of installation be carried out?
Board
-
Has correct material been delivered to site?
-
Has Board been installed in line with Certa Construction issue specs?
-
Have Boards been checked by a Certa Manager?
-
Can next stage of installation be carried out?
Membrane
-
Has correct material been delivered to site?
-
Has Membrane been installed inline with <br>Certa construction issue specs?
-
Has Membrane been checked by a Certa Manager?
-
Can next stage of Installation be carried out?
Rails and Hooks
-
Has correct material been delivered to site?
-
Have rails and hooks been installed in line with Certa Construction issue specs?
-
Have rail and hooks been checked by a Certa Manager?
-
Can next stage of installtion be carried out?
Fire Barrier
-
Has fire barrier been installed to the latest fire strategy revision?
-
Has Fire barrier been checked by a Certa manager?
-
Can next stage of Installation be carried out?
Cladding and fins
-
Has correct Material been delivered to site?
-
Has Cladding and Fins been installed in line with Certa construction issue specs?
-
Have cladding and fins been checked by a Certa manager?
-
Is area ready for snagging?
-
Evidence
Snags
-
Have any snags been identified
-
Photo any snags found
-
Photo snags closed out
-
Is area ready for final QA inspection
Final inspection and handover
Final QA check (to be carried out by Certa QA Manager other Senior Certa Manager)
-
Has all relevant QA checks been carried out on this document and sufficiently answered?
-
Has evidence been provided for relevant sections?
-
Has area been checked for a final quality?
-
Is area ready for handover?
-
Final QA photos
Sign off
-
Certa QA manager or Senior Manager
-
Client representative