Title Page

  • Building

  • Area

  • Zone

  • Works

  • Certa Manager

Installation

Installation Works

  • Type of works

  • Design & Materials Approved

  • ITP's reviewed and understood

  • Personnel Competent <br>

  • All personnel to hold the following training as a minimum;
    CSCS Card
    At least one team member to hold the following training;
    IKO SPM system training. SSSTS, Fire Marshall.

  • Acceptance of Sub Structure

  • Fill out the Hold point release form following a joint inspection, Check ITP for specific criteria

  • Materials Checked Before Use - Photograph approx 10%

  • Provide Evidence

  • Client Set Out Gridlines & Datum

  • Check VCL -Not on all areas see Certa drawing SEI-CER-AN-R1-DR-X-0001.

  • Spectravap vapour control layer, loose layed. Overlap side and end laps by a minimum of 150mm and seal with Spectravap jointing tape.
    At parapets and upstands the VCL must be carried to the upper edge of the thermal insulation and sealed to the upstand or penetration with Spectravap jointing tape.

  • Provide Evidence

  • Check Insulation - Not on all areas see Certa drawing SEI-CER-AN-R1-DR-X-0001.

  • Rockwool Hardrock Multifix-DD insulation laid in a staggered pattern, Mechanically fixed 7no fixings per board at both perimeter and field area.

  • Provide Evidence

  • Check Single Ply Membrane

  • Mechanically fixed Minimum 140mm on field area and 150mm on perimeter. Apply heat to install, Clean lap areas with cleaner.

  • Provide Evidence

  • Electronic Integrity Testing

  • Provide Photo or PDF of test

  • Separation layer

  • Provide Evidence

  • Check Critical interfaces

  • Provide evidence for 100% or critical interfaces

  • Detail Work

  • Provide Evidence for 100% of Detail work

  • Sedum roof installed

  • Sky Garden QA to be issued in conjunction with this report

  • Provide ongoing evidence

  • Check Area free from damage & surplus material

  • Provide Evidence

  • Design & Materials Approved

  • ITP Read and understood

  • Personnel Competency

  • Are operatives trained with relevant IKO cards?

  • Acceptance of Sub Structure

  • Hold Point Release form to be filled out

  • Materials Checked Before Use

  • Check and photograph Approx 10%

  • Client Set Out Gridlines & Datum

  • Peel Test to be carried out

  • Photographic evidence of Peel tests

  • Check substrate and Primer

  • Area to be clean, dry & free of dust prior to product application and temperature in excess of 5 degrees.

  • Photographic evidence of Primer

  • Primary layer of Permatec ecowrap compound

  • Coverage to achieve min of 3mm

  • Photographic evidence of Primary layer

  • IKO Permaflash-R reinforcement layer

  • Permaflash-R to be installed with minimum 75mm laps laid onto the permatec compound while still hot.

  • Photographic evidence of Reinforcement layer

  • Secondary layer IKO Permatec ecowrap Compound

  • Coverage to achieve min 3mm

  • Photographic evidence of second layer

  • Capsheet: IKO Permagurad-F

  • To be layed while second permatec layer is still hot and tacky, ensure that the second coat of IKO Permatec overlaps on to the preceding row by approximately 100mm, enabling a minimum 75mm sealed lap to be formed. Good bleeds to be observed.

  • Photographic evidence of capsheet

  • Electronic Integrity Testing

  • Photograph of Test front page

  • Check Critical Interfaces

  • Photograph 100% of Critical interfaces

  • Photographic evidence of Critical interfaces

  • Detail Work

  • Photograph 100% of detail work

  • Photographic evidence of detail work

  • IKO Enertherm XPS insulation

  • To be layed in a staggered formation with tight abutments

  • Photographic evidence of Insulation

  • IKO Enertherm WCL (water control layer)

  • IKO Enertherm WCL must be laid with 300mm laps, overlapping in the downward direction of he designed flat roof slope. At upstands and penetrations, the membrane must be turned up to finish above the surface of the ballast layer; at drainage outlets, the membrane must be turned down.

  • Photographic evidence of WCL

  • Paving and Ballast

  • Photographic evidence of paving

  • Sedum roof

  • Sky garden to provide QA in conjunction with this form

  • Final cleandown & waste removal

  • Design & Materials Approved

  • ITP's reviewed and understood

  • Personnel Competent <br>

  • All personnel to hold the following training as a minimum;
    CSCS Card
    Experience in Louvre systems required

  • Acceptance of Sub Structure

  • Fill out the Hold point release form following a joint inspection, Check ITP for specific criteria

  • Materials Checked Before Use - Photograph approx 10%

  • Photographic evidence

  • Client Set Out Gridlines & Datum

  • Install L/Z angles

  • 2.0mm PPC ali L/Z fixed with CTF-6.3x45 at 450mm max centres (5mm Ø pilot). Sealprem BR between L/Z & blockwork

  • Photographic evidence if L/Z

  • Install Brackets

  • Renson 418 brackets @ 500mm cts with HTF-SS-A15-6.3x57 (5mm Ø pilot), plastic shims as required

  • Photographic evidence of Brackets

  • Install Lourve blades

  • Renson 411ZF fixed blade louvre c/w insect mesh to rear. PPC ali RAL7016

  • Photographic evidecne of Louvre blades

  • Check Critical Interfaces

  • Photograph 100% of critical interfaces

  • Design & Materials Approved

  • ITP Read and understood

  • Personnel Competency

  • Check operatives are trained with relevant IKO cards?

  • Acceptance of Sub Structure

  • Hold Point Release form to be filled out

  • Materials Checked Before Use

  • Check and photograph Approx 10%

  • Client Set Out Gridlines & Datum

  • Check substrate

  • Metel Deck

  • Metal deck D46 to be fixed to purlins in every pan. Laps to be sealed with tape.

  • Photographic evidecne of Decks

  • Ultra S-A AVCL

  • Bonding agent to be applied as Self adhesive VCL is laid, note agent must be covered withing 4 hours of application and temperature must be min 5 degrees and climbing. Release film and lay in correct alignment ensuring adequate bonding.

  • Photographic evidence of VCL

  • Insulation

  • Insulation to be tightly abutted and laid in a staggered pattern

  • Photographic evidence of Insulation

  • Check Single Ply Memebrane

  • Laps to be sealed and checked, Fixings to be strapped

  • Photographic evidence of Membrane

  • Electronic Integrity Testing

  • Photograph of report front page

  • Check Critical interfaces and detail work

  • Photograph 100% of critical and detail work

  • Check Area free from damage & surplus material

Snagging

Snagging

  • Have any Snags been identified?

  • Photo

  • Have Snags been Rectified?

  • Photo

Senior Manager QA Checks and Handover

Certa QA Manager Final (or Senior Certa Manager) Inspection

  • Have all items on QA form been filled in?

  • Have any 3rd party test or inspection reports been carried out?

  • Is area snag free and ready for handover?

  • Have final QA checks been carried out?

  • Is area ready for handover?

Handover

  • On behalf of Certa Roofing and Cladding LTD

  • On behalf of KIER

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.