Title Page
-
Building
-
Area
-
Elevation
-
Commencement date
-
Certa Manager
Installation
Pre Installation checklist
-
Are drawings construction issue?
-
Are drawings the most current spec?
-
Have project specific calculations & drawings been developed for the system?
-
Is the substructure in line with the current system tolerances?
-
Have Gridlines and Datums been provided by BAM?
-
Has area been handed over from BAM to Certa?
Installation
Type of works
-
Type of works
-
Install ELASTOCOL 500 Primer
-
Install Soprema DUOFLEX Coating - 6MM IN TWO 3MM COATS.
-
Install TR200 DUOFLEX Fleece
-
Install Elastophene Membrane
-
Install inverted roof insulation SOPRA XPS S
-
Install water control/Filter layer STRATEC II
-
Install insulation protection/securement: PAVING SLABS / STONE BALLAST
-
Evidence
-
Install 3mm BITUMEN VAPOUR CONTROL LAYER
-
Install 150mm THK PIR SOPRATHERM F
-
Install 1.5mm THK SOPREMA SINGLE PLY MEMBRANE (MECHANICALLY FIXED)
-
Pitch pocket, Flashings & copings
-
Evidence
-
Install Galvansized Steel Inverted Channel To Suit Both Single & Double Brackets
-
Install Fixed Point: 'Rs-N170d' Double Primary Support Bracket C/W 'Ipad2 Isolator Pad<br>
-
Install Flexi Point: 'Rs-N170s' Primary Support Bracket C/W 'Ipad1' Isolator Pad
-
Install 140mm Rockwool 'Rainscreen Duoslab'
-
Install F60 'Vertical T Profile'
-
Install RS-HG 'Horizontal Rail
-
Install RS-HGB 'Standard Bracket
-
Install 40mm Thick Crosland Hill Sandstone 50 Grit Rubbed C/W 'HG' Support System
-
Evidence
-
Install Galv Or Alum Inverted Channel To Suit Both Single & Double Brackets
-
Install CGL - CS2-1 Support Bracket System C/W Isolator Pad
-
Install 140mm Rockwool 'Rainscreen Duoslab'
-
Install CGL - CS2-1 Vertical Extrusion
-
Install PPC Aluminium 'Hook-On' Rainscreen Interpon D
-
Evidence
-
Pull Out Test
-
Evidence of Pull out test
-
Install 2mm Galv angles
-
Install 0.7mm Thk Pre Coat Drip Flashing with air seal
-
Install 300mm Eurobond Europanels Vertically Laid
-
Install Air seals
-
Install top 2mm Galv angle
-
Install 3mm Aluminium Capping
-
Evidence
Snagging
Snagging
-
Has area been snagged by a Certa manager?
-
Photos of identified snags
-
Photos of closed out snags
-
Can Final QA checks be carried out?
Final QA Checks
Certa QA Manager or Senior Manager final QA inspection
-
Have all sections of this form been complete?
-
Has sufficient evidence been provided?
-
Has area been de snagged?
-
Is area ready for handover?
-
Final QA photos
Handover
-
Certa Manager
-
Bam Manager