Information

  • Job Number

  • Inspection Type

  • Lot Address

  • Conducted on

  • Prepared by

  • Weather Conditions

  • Location

Landscape View

  • Add media

ENTRY

  • Paint top and bottom door - 0.7

  • Front door hinges and hinge screws installed - 0.5

  • Front door striker plate & hinges flush - 0.5

  • Paint finish - 0.7

  • Front door free from binding & striker plate rattle - 0.5.

  • Door furniture free of paint & damage - 0.5

  • Door seals installed - 0.3

  • Door margins - 0.4

  • Sidelight glazing clean and free of scratches - 0.5

  • Jambs and sill - 0.4

  • General Comments

  • 4%

ENTRY HALL

  • Floor coverings - 0.5

  • Arcs and skirts - 0.4

  • Plaster - 0.5

  • Coat/linn - 0.4

  • Bulkheads & niche - 0.3

  • Garage door & jamb free of damage/chips - 0.4

  • Garage door free from binding & striker plate rattle - 0.4

  • Garage door hinge screws installed & pins siting flush - 0.4

  • Garage door seal installed - 0.4

  • Garage door furniture free from paint & damage - 0.4

  • Paint finish - 0.5

  • General Comments

  • 3%

Master Bedroom

  • Paint

  • Plaster

  • Skirt & Arcs<br>

  • Floor covering<br>

  • Windows, glass, frame & fly screens

  • Door furniture

  • Door Margins

  • Door hinge screws installed & pins sitting flush

  • Door free of binding & striker plate rattle

  • Double door mushroom stop installed correctly

  • Key lock operational

WALK IN ROBE

  • Paint finish - 0.4

  • Skirts & arcs - 0.4

  • Man hole completed- 0.3

  • Floor converings - 0.3

  • General comments - 0.3

  • 2%

ENSUITE

  • Plaster - 0.4

  • Door furniture - 0.3

  • WC Door hinge screws installed and pins sitting flush - 0.3

  • WC Lift off hinges installed & operational - 0.3

  • WC door free of binding & striker plate rattle - 0.3

  • Cavity slider guide installed & door operational - 0.3

  • WC & cavity slider door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint finish - 0.4

  • Glass and window frames - 0.4

  • Bench tops free of damage - 0.3

  • Cabinets and shelves - 0.3

  • Screw holes & penetrations covered to cabinets and shelves - 0.3

  • Towel rails & toilet roll holders fixed securely- 0.3

  • Wall and floor tiles - 0.4

  • Plumbing fit off - 0.3

  • Shower screen - 0.3

  • Shower screen free of leaks - 0.3

  • Shower waste free of glue - 0.5

  • Caulk above tiles in shower - 0.5

  • Mirror plaster junctions caulked - 0.3

  • Caulking complete - 0.3

  • Toilet suite and seat - 0.3

  • Pan secure - 0.4

  • Niche tiling graded fall - 0.2

  • Paint top edges of skirting tiles 0.3

  • Plaster - 0.4

  • All fans fitting flush and straight- 0.5

  • Basin - 0.5

  • General Comments

  • 7%

KITCHEN

  • Splash back and tiles - 0.4

  • All waste points capped off - 0.4

  • Sink free of dents and scratches - 0.5

  • Sink plugs operational - 1.0

  • Plumbing fit off - 0.5

  • Cabinetry free of gaps - 0.4

  • Cabinets, drawers, doors, shelves all free of damage - 0.4

  • Island bench square - 0.4

  • All screw holes & penatrations in cabinetry covered - 0.4

  • All shelf pins installed and secure - 0.4

  • All stone installed without chips, scratches & marks - 0.4

  • Plaster - 0.4

  • Overhead cupboards caulked - 0.4

  • Caulking completed - 0.4

  • Arcs and skirts - 0.4

  • Glass and windows frames & fly screen - 0.5

  • Floor coverings - 0.4

  • Bulkheads - 0.3

  • Paint finish - 0.4

  • General Comments

  • 4.5%

BUTLERS PANTRY

  • Door & Jamb & Furniture - 0.3

  • Door hinge screws installed & pins siting flush - 0.3

  • Door free of binding & striker plate rattle - 0.3

  • Bench tops - 0.2

  • Plumbing fit off - 0.2

  • Splashback or tiles - 0.2

  • Cabinets, doors, drawers & shelves - 0.2

  • Plaster - 0.2

  • Arcs and skirts - 0.2

  • Glass and window frames & fly screens - 0.2

  • Floor coverings - 0.2

  • Bulkheads - 0.2

  • Paint finish - 0.2

  • General Comments

  • 2.3%

DINING ROOM

  • Plaster - 0.5

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint finish - 0.5

  • Floor coverings - 0.4

  • Glass and window frames & fly screens - 0.4

  • Sliding door operational- 0.3

  • General Comments

  • 3%

LIVING ROOM

  • Plaster - 0.4

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.4

  • Paint finish - 0.4

  • Glass and window frames & fly screens - 0.5

  • Floor coverings - 0.4

  • General Comments

  • 3%

RUMPUS/ THEATRE

  • Plaster - 0.4

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Door free from binding & striker plate rattle - 0.3

  • Door hinge screws installed and pins sitting flush. - 0.3

  • Arcs and skirts - 0.3

  • Paint finish - 0.4

  • Glass and window frames & flyscreens - 0.5

  • Sliding door operational- 0.5

  • Floor coverage - 0.4

  • General Comments

  • 3%

BED 2

  • Wardrobe fit out - 0.3

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door hinge screws installed & pins siting flush - 0.2

  • Door free from binding & striker plate rattle - 0.2

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint - 0.4

  • Glass and window frames & flyscreen - 0.4

  • Floor coverings - 0.3

  • Plaster - 0.4

  • General Comments

  • 3%

REAR HALL

  • Plaster - 0.3

  • Paint finish - 0.3

  • Arcs and skirts - 0.3

  • Linen doors and jambs - 0.3

  • Linen doors free of binding & striker plate rattle - 0.3

  • Linen doors hinge screws installed and pins sitting flush - 0.3

  • Linen door furniture - 0.3

  • Floor coverings - 0.3

  • General Comments

  • 2%

LAUNDRY

  • Doors and jambs - 0.3

  • Doors and margins - 0.3

  • Door furniture - 0.3

  • Door free from binding & striker plate rattle - 0.3

  • Door hinge screws installed & pins sitting flush - 0.3

  • Arcs and skirts - 0.2

  • Paint finish - 0.2

  • Sliding door operartional - 0.3

  • Wall and floor tiles - 0.3

  • Plumbing fit off - 0.2

  • All waste points capped off - 0.2

  • Trough and cabinet free of damage - 0.2

  • Cabinet doors adjusted - 0.2

  • Trough and cabinet screw holes & penetrations covered - 0.2

  • Paint top edge of skirting tiles - 0.2

  • Plaster - 0.2

  • External door paint top and bottom - 0.5

  • General Comments

  • 3%

WC 1

  • Plaster - 0.2

  • Doors and jambs 0.2

  • Door furniture - 0.2

  • Door free from binding & striker plate rattle - 0.2

  • Door hinge screws installed and pins sitting flush - 0.2

  • Lift off hinges installed operational - 0.2

  • Arcs and skirts - 0.2

  • Door margins - 0.2

  • Paint top edge of skirting tiles - 0.2

  • Glass and window frames & flyscreens - 0.2

  • Paint - 0.2

  • Toilet suite and seat - 0.2

  • Pan secure - 0.2

  • Floor tiling - 0.2

  • General Comments

  • 2.2%

BATHROOM

  • Doors and jambs - 0.3

  • Door hinge screws installed & pins siting flush - 0.3

  • Door free from binding & striker plate rattle - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint finish - 0.4

  • Glass and window frames & flyscreens - 0.4

  • Bench tops free of damage - 0.3

  • Cabinet and shelves free of damage - 0.3

  • Cabinet doors adjusted - 0.3

  • Cabinet and shelves screw holes and penetrations covered - 0.3

  • Cabinet and shelves screw holes and penetrations covered - 0.3

  • Plumbing fit off - 0.3

  • Wall and floor tiles - 0.3

  • Mirror - 0.3

  • Mirror plaster junction caulked - 0.3

  • Caulking completed - 0.3

  • Toilet suite and seat - 0.2

  • Pan secure - 0.2

  • Niche tiling graded fall - 0.2

  • Paint top edge of skirting tiles - 0.2

  • Bath condition - 0.5

  • Bath installed square - 0.5

  • Shower screen - 0.3

  • Shower base condition - 0.5

  • Shower waste free of glue - 0.5

  • Shower screen free of leaks - 0.5

  • Towel holder & toilet roll holder fixed securely - 0.5

  • Plaster - 0.4

  • Basin installed square - 0.5

  • General Comments

  • 6.5%

BED 3

  • Wardrobe fit out - 0.3

  • Doors and jambs - 0.3

  • Door hinge screws installed & pins siting flush - 0.3

  • Door free of binding and striker plate rattle - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint finish - 0.4

  • Glass and window frames & flyscreens - 0.4

  • Floor coverings - 0.3

  • Plaster - 0.4

  • General Comments

  • 3 %

BED 4

  • Door hinge screws installed & pins siting flush - 0.3

  • Doors free of binding & striker plate rattle - 0.3

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint finish - 0.4

  • Glass and window frames & flycreens - 0.4

  • Floor coverings - 0.3

  • Plaster - 0.4

  • General Comments

  • 3%

POWDER ROOM

  • Doors and jambs - 0.3

  • Door furniture - 0.3

  • Door margins - 0.3

  • Arcs and skirts - 0.3

  • Paint - 0.3

  • Glass and window frames - 0.3

  • Bench tops - 0.3

  • Cabinets and shelves - 0.3

  • Plumbing fit off - 0.3

  • Wall and floor tiles - 0.3

  • Mirror - 0.3

  • Toilet suite and seat - 0.3

  • Pan secure - 0.3

  • Paint top of skirting tiles - 0.3

  • Plaster - 0.3

  • Basin - 0.5

  • General Comments

  • 5%

GARAGE

  • Slab free of damage, paint & excess mortar/ concrete - 0.3

  • Door striker plate and hinges checked in flush - 0.2

  • Door margins & doors free of binding - 0.2

  • Door seals - 0.2

  • External door painted top and bottom - 0.7

  • Door, door jamb & still free of damage - 0.2

  • Door furniture free of damage & paint - 0.3

  • Plaster and paint - 0.5

  • Arcs and skirts - 0.2

  • Panel lift or roller door operational - 1.0

  • Panel lift door rebate installed level & continues across whole door - 1.0

  • Brick plaster junctions arced/ caulked - 1.0

  • Plaster to garage LVL junction flush - 1.0

  • General Comments

  • 3%

ALFRESCO

  • Paint finish - 0.5

  • Plaster - 0.5

  • Quad installed straight and level - 0.5

  • Plumbing fit off - 0.5

  • General Comments

  • 3%

PORCH

  • Paint finish - 0.5

  • Eave sheeting completed - 0.5

  • Cladding completed - 0.5

  • Porch and pillar lighting completed sitting straight and free of paint or silicon - 0.5

  • General Comments

  • 2%

BRICKWORK / HEBEL

  • Joint bed and perp sizes - 1.0

  • Weep holes clear & Weepa covers installed and covers removed to all BAL jobs - 1.0

  • All brick work plumb & straight - 1.0

  • Brick clean - 1.0

  • Brick work free of paint - 1.0

  • Mortar color consistency - 1.0

  • Brickwork free of blowouts - 1.0

  • 5mm window sill clearance - 1.0

  • Brick slab overhang - 0.5

  • AJ’s continuous & installed according to engineering - 1.0

  • AJ’s caulked - 1.0

  • Render - Complete and free of damage and marks. - 0.4

  • Hebel - Paving / Dirt clear of underside of Hebel. 25mm minimum clearance.

  • General Comments

  • 6%

EXTERNAL

  • Telecommunication lead in installed - 0.5

  • Gas line installed - 0.5

  • Gas meter installed - 0.3

  • Part B termite protection & Sticker installed in meter box - 0.5

  • 4 x additional stormwater risers + HWS overflow installed - 0.5

  • All external risers capped off- 1.0

  • Final CCTV inspection passed to sewer & stormwater - 1.0<br>

  • No leaks to potable or grey water outlets - 1.0

  • AGG drains connected to zero boundary/ retaining walls - 1.0

  • All eaves complete & quad straight and level - 1.0

  • Flashing & over-flashing completed and free of damage - 0.5

  • Zero boundary flashing installed correctly with flashing falling away from house & free of gaps - 0.5

  • All down pipes connected, fixed securely & in correct location - 1.0

  • Gutter & facia finished flush to raised porch & sealed with fall towards down pipe - 1.0

  • All gutter clips installed correctly - 1.0

  • Down pipes, gutter & facia free of scratches & dents - 0.5

  • All windows frames clean & free of scratches - 0.5

  • Are all windows free of protective plastic - 0.5

  • Paint boots - 0.5

  • Roof service completed & sticker in meter box - 1.0

  • Foot bays, crossover, curb and channel clean & free of damage caused post site start - 0.5

  • Paving completed clean and free of damage - 0.5

  • Site free of rubbish, building material, soil & rock - 0.5

  • Step down completed - 0.5

  • General Comments

  • 11.5%

GENERAL COMMENTS NOT COVERED ABOVE

  • General Comments Not Covered Above

FIRST INSPECTION

  • PASS OR FAIL

  • TOTAL PERCENTAGE SCORE=

  • Signature :

RE-INSPECTION

  • Select date

  • All items complete as per inspection

  • Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.