Title Page
-
Audit Title
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Earthmoving Plant Checklist
-
Operator training and instruction has been provided (instruction may include pre-start and or toolbox meetings)
-
Operator’s manual provided
-
Access and egress is adequate
-
Pedestrian movement is controlled (including a procedure for the interaction of personnel and mobile plant
-
Training is provided to personnel on the interaction procedure and blind spots on the mobile plant
-
Traffic management is in place (including exclusion zones and turn around areas where applicable)
-
Ground conditions are acceptable
-
Hazards associated with the work area have been identified and accessed. Control measures are in place
-
Machine controls are labelled for function and direction
-
Articulation point is clearly labelled identifying crush hazards
-
Seating is adequate
-
Hot parts are guarded
-
ROPS is fitted (except track mounted excavators)
-
Reverse alarm is functional if fitted
-
Active revolving light is functional if fitted
-
Side mirrors are fitted
-
Seatbelt is fitted and functional
-
Lifting point has SWL stated or load chart provided
-
Two way communication between mobile plant operator and personnel (radio communication must be held on the person in the area) <br>
-
When parked has bucket placed on the ground
-
High visibility vest are worn by personnel in the area
-
Routine servicing / maintenance is carried out