Information

  • Customer Details

  • Site Name:

  • Inspection Title:

  • Document No.

  • Date:

  • Earthworks Stage Inspection

General

  • Time

  • ITP Inspection

  • Inspection Type

  • Basic Location

  • Specific Location/s

  • Attendees

  • Other Attendees

Pre-Works

  • Are there any Overhead or Buried Services present in the general work area

  • Is GS6 Protection, Easement, Barriers & Signage in place

  • STOP Works, inform Supervisor and wait until Barriers and Height Protection is in place

  • Are works to be undertaken within the GS6 area

  • Are Height Restrictors fitted to Excavators and the SWH confirmed by Utility Company

  • STOP works until confirmation of the SWH are provided

  • Does the SWH allow smaller plant to operate within the GS6 area

  • Setting Out undertaken and clearly defined

  • Ensure Setting Out is completed and checked before commencing works

  • Service Plans checked

  • Obtain Plans before continuing

  • CAT Scan undertaken

  • All Services clearly identified and marked on ground

  • Permit To Dig in place

  • Add Details/Photo of Permit

  • Ensure Permit To Dig is in place before starting works

  • STOP Works. Do not continue until a Permit To Dig is provided

  • Works Brief, extent and Specification clearly communicated to Supervisor and Operatives

  • Add signature

  • Add signature

  • Works Phase

  • Is the extent of works clearly defined and any vegetation or features to be saved clearly identified

  • Show Plan

  • Archaeology identified and protected

  • Add notes

  • Add photos

  • Ecology identified and protected

  • Add Notes

  • Add photos

  • Are there any unexpected Ecological Issues

  • Describe:

  • Photo's

  • STOP Works and inform Supervisor

  • Grubbing clear

  • Add notes

  • Add photos

  • Post Grubbing OK

  • Add notes

  • Add photos

  • Extent of Topsoil strip clearly defined and depth clarified

  • Add notes

  • Add plan and photos

  • Stockpile locations defined

  • Add notes

  • Add plan & photos

  • Describe the soils general condition

  • Do any Services, Features or Buildings require relocation, protection, shoring, barriers or fencing

  • Add notes

  • Add Photo's

  • Are depths and levels clearly defined, set out and communicated with Operatives

  • Add notes

  • Add plans and photos

  • Confirm Dimensions, Depths & Extent

  • Pre-Works Level Survey Carried Out

  • Add notes

  • Add photos

  • Are the underlying soil types identified

  • Describe soil type

  • Does the planned method need changing due to soil type/conditions encountered

  • Any unsuitable, wet or poor Material Identified

  • Add notes

  • Add photos

  • Has Groundwater been encountered

  • Is pumping or dewatering required

  • Foundation / Subgrade Preparation OK

  • Add notes

  • Add photos

  • Excavation Complete

  • Add notes

  • Add photos

  • Have levels been checked and Survey retaken

  • Are the areas of Filling clearly defined and levels set out

  • Add notes

  • Add photos

  • Compaction - Material filled in layers/depths to Specification

  • Add notes

  • Add photos

  • Proof Roll OK

  • Add notes

  • Add photos

  • Surface is satisfactory with no dips, hollows, standing water or other deviation outside of accepted Tolerance

  • Add notes

  • Add photos

  • Have Earthworks been affected by prevailing weather or conditions

  • Describe:

  • Add Photo's

  • Stage Final Survey

  • Add notes

  • Add photos

  • Final Trim & Shaping

  • Add notes

  • Add photos

  • Material Complies

  • Add notes

  • Add photos

  • Subgrade Proof Roll Satisfactory

  • Add notes

  • Add photos

  • Road base proof roll satifactory

  • Add notes

  • Add photos

  • Compaction Tests Comply

  • Add notes

  • Add photos

  • Has Trimming been affected by prevailing weather conditions

  • Add Notes

  • Add Photo's

  • As built Stage Survey

  • Add notes

  • Add photos

  • Has the weather influenced or affected the works

  • Add notes

  • Are Topsoil stacks graded safe and weather sealed

  • Is the Formation graded, prepared and ready for Topsoil

  • Is the surface dry with no standing water, ponding areas or erosion

  • Is Decompaction or Ripping required

  • Is the Topsoil Depth to be respread communicated and checked

  • Has the Topsoil been trimmed, consolidated and graded

  • Has Topsoil Respreading been affected by prevailing weather conditions

  • Add notes

  • Add photos

Signoff

  • Inspector

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.