Title Page

  • Site conducted

  • Project:

  • Checklist no.

  • Inspection by:

  • Date/Time

  • Section / Location on Site

  • Chamber ID

  • Element of Works:

  • Inspection Stage

  • Plan Excerpt

    Chamber Inspection
  • Chamber ID

  • Confirm Chamber type

  • Cover Type

  • Cover is correct grade for location

  • Cover damage?

  • Cover to correct level, cleaned and complete

  • Confirm type of construction

  • Confirm size of chamber

  • Correct grade of brick or riser used

  • Concrete ring seals in place

  • Step irons and landings located correctly

  • Main channel or inverts to correct grade and level

  • Cover Slab bedded and positioned correctly over step irons

  • Minimum 1 course engineering bricks between cover slab and frame

  • Benching, inlets & channel to Spec

  • Sump to depth on Silt Chamber

  • Does the sump require cleaning

  • Inlet pipes trimmed and tidy

  • Images of Chamber

  • Any other Comments

  • Actions required

  • Sign off chamber by MJA:

  • Completed By:

Section Sign Off

  • All Chambers within Section have been inspected and any Remedial Works undertaken

  • Completion Date

  • Sign off for MJA

  • Sign off for Main Contractor/Client

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.