Title Page
-
Site conducted
-
Project:
-
Checklist no.
-
Inspection by:
-
Date/Time
-
Section / Location on Site
- Stables
- EWC1
- EWC2
- Gate House
- Walled Garden
- Service Yard
- South Yard
- Drop Off
- A1
- A2
- B1
- C1
- D1
- D2
- D3
- E1
- E2
- E3
- H
- G1
- G2
- G3
- L
- Zone 6.1 & 6.2
- Zone 1
- Zone 2
- Zone 3
- Zone 8
- Zone 9
-
Chamber ID
-
Element of Works:
-
Inspection Stage
-
Plan Excerpt
- Chamber Inspection
-
Chamber ID
-
Confirm Chamber type
- Foul Drain
- Storm Through
- Storm Silt Trap
- Land Drain Through
- Land Drain Silt Trap
- Duct Box
- Pump Chamber
-
Cover Type
-
Cover is correct grade for location
-
Cover damage?
-
Cover to correct level, cleaned and complete
-
Confirm type of construction
-
Confirm size of chamber
-
Correct grade of brick or riser used
-
Concrete ring seals in place
-
Step irons and landings located correctly
-
Main channel or inverts to correct grade and level
-
Cover Slab bedded and positioned correctly over step irons
-
Minimum 1 course engineering bricks between cover slab and frame
-
Benching, inlets & channel to Spec
-
Sump to depth on Silt Chamber
-
Does the sump require cleaning
-
Inlet pipes trimmed and tidy
-
Images of Chamber
-
Any other Comments
-
Actions required
-
Sign off chamber by MJA:
-
Completed By:
Section Sign Off
-
All Chambers within Section have been inspected and any Remedial Works undertaken
-
Completion Date
-
Sign off for MJA
-
Sign off for Main Contractor/Client