Title Page
-
Site conducted
-
Project:
-
Checklist no.
-
Inspection by:
-
Date/Time
-
Section / Location on Site
-
Chamber ID
-
Element of Works:
-
Inspection Stage
-
Plan Excerpt
Declaration
-
PREPARATION: This section must be completed before breaking ground or construction.
-
Risk Assessment & Method Statements submitted and approved
-
Suitability of lifting gear & excavator (SWL marked and tests certificates available)
-
Stability of adjacent structures
-
Ground Conditions assessed and method confirmed suitable
-
Obtain approval for alternative design if watertight construction specified
-
Arrange for mortar to be batched using gauge boxes or buckets (ie: not by shovelful).
-
Arrange for mortar and concrete cubes to be taken
-
INSTALLATION: Please provide details as required
-
Confirm type of construction
-
Confirm size of chamber
-
Are excavation supports, shoring or a manhole box required
-
Please state type
-
Reason for no support
- Large Excavation not requiring support
- Shallow Depth not requiring support
- Ground Stable
-
Size of Excavation
-
Is there provision for passage of groundwater to pass if required
-
Base Reinforcement provided if required
-
Base concrete to specification and thoroughly compacted
-
Correct grade of brick used
-
Concrete ring seals in place
-
Correct grade of mortar used
-
Brick bonding and dimensions
-
Brickwork support over pipe entries
-
Details
-
Step irons and landings located correctly
-
Main channel or inverts to correct grade and level
-
Cover Slab bedded and positioned correctly over step irons
-
Minimum 2 course engineering bricks between cover slab and frame
-
Cover is correct grade for location
-
Comments
-
Benching, inlets & channel to Spec
-
Sump to depth on Silt Chamber
-
Does the sump require cleaning
-
Inlet pipes trimmed and tidy
-
Cover Type
-
Cover damage?
-
Cover to correct level, cleaned and complete
-
Images of Chamber
-
Any other Comments
-
Sign off chamber by MJA:
-
Completed By: