Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Select 3 Production areas that will be assessed in main kitchen. Example. Hot Production, Cold production, salad bar, ect.
-
Production Area 1
-
Production Area 2
-
Production Area 3
Select 3 service areas that will be assessed in the serice area. Example, Home, Action Station, Pizza, MTO station
-
Production area 1
-
Production area 2
-
Production area 3
-
PROVIDE previous day's/cycles production sheet for all selected areas.
-
Identify a leftover.
Main Kitchen/ Production area
-
1. Are food waste bins in place? No food in trash cans and waste bins off the floor with correct label.
-
2. Does the production area have a forecasted meal/customer count on the production worksheet?
-
3. Do the forecasted portions to prepare for the selected item reflect adjustments made from previous production results?
-
4. Do the selected items being prepared/served on a prodcution worksheet(s) contain the following information: Forecasted portions to prepare, Portion size, Recipe Number, All ingredients listed on the MTO Stations?
-
5. Are the recipes for the selected items generated for the forecasted portions, batch, and/or single service portion as appropriate?
-
6. Is the recipe for the item followed as written?
-
7. Does the portion served match the portion size indicated on the recipe and/or the production worksheet?
Service Area
-
Select menu items being producted in selected Service Area.
-
8. Do the selected items being prepared/served on a production worksheet(s) contain the following information: Forcasted portions to prepare, portion size, recipe number, all ingredients listed on MTO Stations?
-
9. Is the recipe for the item followed as written?
-
10. Does the portion served match the portion size indicated on the recipe and/or the production worksheet?
-
11. Are food waste bins in place?
Office
-
12. Is the post production information for the leftover item completed on the production worksheet for the day items was originally served?
-
13. Are post production results completed accurately for previous days production sheets?
-
14. Is there planned and documented usage for identified leftover portions?
-
15. Is the Waste Tracking Log completed?
-
16. Are leftover portions and waste poundage data accurately entered into productivity tracker? (Compare 3 Random days of production worksheets and waste logs to productivity tracker.)