Title Page

  • Conducted on

  • Prepared by

  • WTG

Golden Lifting rules

  • 1. STOP, THINK and ACT

  • 2. I am In GOOD CONDITION and WELL EQUIPPED

  • 3. I Take care of GOOD HOUSEKEEPING: Clear lifting area

  • 4. I KNOW and RESPECT the LIFTING PROCEDURE

  • 5. I COMMUNICATE with the crane driver & signaller

LAST MINUTE RISK ASSESSMENT for NON STANDARD LOADS

  • Is the lifting gear certified and undamaged? Check colour code!

  • Do we have our helmet?

  • Do we have taglines in case needed?

  • Do we have the slinger banksman training?

  • Is the battery of the remote control of the Palfinger crane replaced?

  • Are the weather conditions acceptable?

EXTRA QUESTIONS

  • Communication lines checked & number of UHF radios present ok?

  • Evaluation made of PPE needed for the job? (e.g. type of mask correct?Helmet required?)

  • Other safety hazards or remarks? (REPORT ALL HAZARDS IN A SHOC)

  • Needed actions when one or more answers is no (STOP-THINK-ACT)

CONFIRMATION OF TOOLBOX TALK AND PRESENTATION OF METHOD STATEMENT

  • 1. Name

  • 2. Name

  • 3. Name

  • 4. Name

  • 5. Name

  • 6. Name

  • 7. Name

  • 8. Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.