Title Page
-
Conducted on
-
Prepared by
-
WTG
Golden Lifting rules
-
1. STOP, THINK and ACT
-
2. I am In GOOD CONDITION and WELL EQUIPPED
-
3. I Take care of GOOD HOUSEKEEPING: Clear lifting area
-
4. I KNOW and RESPECT the LIFTING PROCEDURE
-
5. I COMMUNICATE with the crane driver & signaller
LAST MINUTE RISK ASSESSMENT for NON STANDARD LOADS
-
Is the lifting gear certified and undamaged? Check colour code!
-
Do we have our helmet?
-
Do we have taglines in case needed?
-
Do we have the slinger banksman training?
-
Is the battery of the remote control of the Palfinger crane replaced?
-
Are the weather conditions acceptable?
EXTRA QUESTIONS
-
Communication lines checked & number of UHF radios present ok?
-
Evaluation made of PPE needed for the job? (e.g. type of mask correct?Helmet required?)
-
Other safety hazards or remarks? (REPORT ALL HAZARDS IN A SHOC)
-
Needed actions when one or more answers is no (STOP-THINK-ACT)
CONFIRMATION OF TOOLBOX TALK AND PRESENTATION OF METHOD STATEMENT
-
1. Name
-
2. Name
-
3. Name
-
4. Name
-
5. Name
-
6. Name
-
7. Name
-
8. Name