Information
-
Audit Title
-
Document No.
-
Conducted on
-
Prepared by
-
Location
Post work checklist
-
Operatives
-
frequency
- Weekly
- Monthly
- Bi-Monthly
- 3 Monthly
- 6 Monthly
- Yearly
- One off
-
Work Order No(s):
-
Haz Work Permit completed & signed off?
-
Pre task Check sheet(s) (All maybe on one sheet) evidencing:
-
The inspection of harness, lanyards,Karabiner, cows tails other equipment secured upon operative(s) & anchor points
-
Equipment tags or notices that Testing has taken place in the last 6 months eg BMU; Dead Weight Trolley, MEWP
-
Eye bolt inspection date evidence
-
Latchway / Mansafe checked
-
Hired Equipment testing evidence
-
Wind Speed checks have taken place.
-
Operatives signatures showing read, understood and will comply with the task RAMS. (If not already done so)
Sign Off
-
Auditor's signature