Title Page

  • Site conducted

  • Outlet / Buncode

  • Date

  • Panama Reference Number

  • Panama Engineer

  • Location
  • Site Foreman

  • Scope of Works (VOIP/WiFi Cabling etc)

  • Complete Health & Safety (RAMS) with Site Foreman

  • Explain day's events to Site Foreman

  • WiFi deinstalled (My Smart WiFi sites)

  • Lay all WiFi and VOIP Cabling (where applicable) to detailed Positions

  • Remove any redundant Sockets, Cable and Trunking where appropriate

  • De-Install old legacy Phones and WiFi

  • State where existing positions of APs/Phones are located (if not being relocated))

  • Photos of the above...and where equipment has been stored

  • Check if BT Requirements have been fulfilled since PCM (New PSTN ADSL etc) and report Status back to RTS

  • Location of Comms Cabinet

  • Photo of the above

  • Outstanding Issues

  • Label ends of all Cables and Show Site Foreman

  • Photograph evidence of the above

  • Additional Comments

  • Complete and send to admin@panamacommunications.co.uk

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.