Site Info

  • Site Conducted

  • Conducted on

  • Prepared by

  • Location
  • Postcode

Exterior Info

  • Where is the Sky Dish Located?

  • Image of the dish

  • Is the dish compatible with a Sky Q LNB?

  • Will the dish need to be replaced?

  • What access equipment is required to safely work on the LNB/Dish?

  • In your opinion, is the sky dish location suitable and fit for purpose?

  • If 'No' please explain why?

  • How many feeds go down to the existing boxes?

  • Do any EXTERNAL cables need replacing or NEW feeds adding?

Interior Info

  • Where are the Sky Boxes located?

  • How many Sky Boxes are there?

  • Please note the existing sky card numbers

  • Is there sufficient power for the Sky Boxes?

  • Is there sufficient power to add a Network Switch, dSCR Multiswitch and any DACs/Audio Delays?

  • How many additional DOUBLE GANG sockets are required?

  • Is there Sufficient physical space in the rack for the NEW Sky-Q Boxes, A Network Switch, any dSCR Multiswitches and any DAC's/Delays?

  • Qty of DAC's required for audio breakout?

  • How many existing DAC's can we reuse?

  • Where is the audio signal from each CURRENT sky box connected to?

  • Please specify 'Other'

NETWORKING

  • Where is the existing network equipment?

Video Infrastructure.

  • How are the EXISTING sky channels changed?

  • Please specify 'Other'

  • What type of video distribution is installed at this venue?

  • How many outputs does the RF Amplifier have?

  • How many Analogue RF Modulators are connected to the system?

  • How many outputs does the RF Amplifier have?

  • How many HDMI to DVB-T Modulators are connected to the system?

  • How many switches does the NHD System use?

  • What make and model Network Switch(es) is/are installed?

  • How many Physical RJ45 ports are on the switch?

  • How many spare 'U' spaces are available in the rack?

  • Please indicate a suitable location to add in a second network switch or addition 6u rack. (photo's)

  • As a result of adding in another 6u rack, will the NHD Networking need recabling?

  • How many NHD TX cards are connected to the system (inc remote units)

  • What series NHD TX/RX are installed in the venue?

  • How many NHD RX cards are connected to the system?

  • How many Wyrestorm matrices are installed in the Venue?

  • What model(s) are installed?

  • What make and model network switch is installed to control the JAP system?

  • How is the JAP system controlled/switched?

  • What type/series of JAP units are installed?

  • How many HDAnywhere MHUB matrices are installed in the venue?

  • What model HDAnywhere MHUB matrices are installed in the venue?

  • How many Pulse8 matrices are installed in the venue?

  • What model Pulse8 matrices are installed in the venue?

  • How TV's are there in the trading area?

  • How many Projectors/Screens are there in the trading area?

SUPPLIMENTARY INFORMATION

  • Are there any other notable points that need raising about the site that may impact a successful Sky-Q upgrade?

Celestra

  • Where is the AV Rack located

  • Where is the AV Rack Located

  • Example of EPOS comms cabinet

    d1eda821-c723-464b-b44c-10e5a7315aeb.png
  • Is the AV Rack located in the same room as the EPOS comms cabinets

  • Where is the comms cab located?

  • Please list below cabling requirments

  • Do you see any challenges with the cabling route between comms cab and AV rack?

  • Please detail any possible challanges and why? With recommended solution if possible?

  • Please include any supporting photos of cabling route

  • Is there a possibility the route runs externally?

  • Provide details on cable route. Provide as much details as possible

  • Length of cable run from the office to the AV position (avg in meters)

  • Will there be trunking required?

  • Colour of trunking required?

  • Number of metres required?

  • Detail cabling route

  • Take a perspective photo of the cab and AV rack

  • Provide annotated photos of cabling route

  • Is there a patch panel in the AV rack?

  • Example of unloaded patch panel

    Unloaded PP.png
  • Is the patch panel loaded or unloaded?

  • Model of Patch Panel?

  • Is there room for a patch panel?

  • Provide photo of location

  • Provide photo of where should data be terminated on the wall?

  • Is an AV switch required?

  • Is there existing PDU in AV rack?

  • Is there spare socket on the PDU?

Comms Cab

  • Size of Comms cab

  • Where is the switches and routers situated

  • Provide photo

  • Example of unloaded patch panel

    Unloaded PP.png
  • Model of Patch Panel?

  • Is the patch panel loaded or unloaded?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.