Audit Title
-
Client / Site
-
Location
-
Prepared by
-
Contact phone number
-
Conducted on
-
Other staff
-
Development Application Number
-
Complying Development Number
-
Construction Certificate Number
Inspection items
Stormwater pipes
-
Stormwater pipes installed as per development consent
-
Notes
-
Stormwater pipes are appropriately sealed
-
Notes
-
Stormwater pipes sit on appropriate bedding
-
Notes
-
Stormwater pipes of appropriate material
-
Notes
-
Pits have been installed correctly
-
Notes
-
Inlet pits of required dimensions
-
Notes
-
Arresters of required dimensions
-
Notes
-
Absorption trench has been installed in accordance with development consent
-
Notes
-
Absorption trench depth, width and length as per engineers details
-
Notes
-
Inspection openings are easily accessible
-
Notes
-
Rainwater tanks are installed and overflow appropriately connected
-
Notes
-
Stormwater pipes are appropriately graded
-
Notes
-
Stormwater discharges to an approved disposal system
-
Notes
-
Stormwater down pipes serve no more than 12m of guttering
-
Notes
-
Surface inlets have been installed
-
Notes
-
All wells, pits and detention systems are clean, free of foreign material and can operate as intended
-
Notes
-
Detention system as per approved hydraulic details
-
Notes
-
Openings or spigots provided on balconies or terraces to drain water
-
Notes
-
Discharge outlet to street is adequate
-
Notes
Pump system
-
Pump system located within an accessible area
-
Notes
-
Constructed of materials that will resist corrosion of ground water and aggressive soils
-
Notes
-
Ladder to be to be installed where wet wells exceed 1.2m
-
Notes
-
Alarm to be provided to avoid flooding
-
Notes
-
The inlet to the wet well is located at least 100mm above the level of the design top water level
-
Notes
-
Two pumps provided in the pump set
-
Notes
-
Pump set and equipment is securely fixed to the we well using corrosion resistant fixings
-
Notes
Guttering
-
Box guttering has overflow device
-
Notes
-
Higher catchment area is directed to an appropriately sized rain head or sump
-
Notes
-
Guttering is appropriately sealed at joints
-
Notes
-
Stormwater system satisfies BASIX
-
Notes
-
Development as per the Development Consent
-
Noted unauthorised development
-
Backfill with appropriate material
-
Site notes
-
Photograph
Required information
-
Required information to be submitted to Council
- Works As Executed (as required by conditions of consent)
- Plumbers diagram
- Hydraulic engineers certificate
Inspection result
-
Result of the inspection
- Satisfactory
- Satisfactory - minor works to be carried out
- Unsatisfactory - reinspection required after rectification works carried out
- Unsatisfactory - works not complete
- Stop all works - contact councils duty planner on 9735 1222, regarding unauthorised works
-
Should you have any enquiries regarding this inspection report please contact Auburn City Council on 9735 1222 or via email council@auburn.nsw.gov.au or in person at the customer service centre located at 1Susan Street, Auburn.