Title Page
-
Conducted on
-
Prepared by
-
Location
-
Project:
-
Client:
-
Contractor:
-
Site Conditions:
Safety
-
Are TTM's in place and in accordance with plans?Is correct
-
Is correct PPE being used by the contractor?
-
Are open trenches protected using bunting, fencing or similar?
-
Are trenches over 1.5m benched, battered or are shoring boxes in use?
-
Are materials being stored safely?
-
Are there any other safety concerns? If so detail, Photograph and assign actions. Note: If there is an immediate risk to a persons safety then instruct the works to stop and contact the person in control of the site as well as Spiire Construction Team.
Environmental
-
Is the contractor working in accordance with the approved EPA drawings?
-
Is dust being suppressed during the excavation and backfilling of trenches?
-
Are there any other concerns regarding Environmental issues? If so detail, photograph and assign actions.
Trench Excavation
-
Is there any groundwater in trench? If so please detail method used for bedding and haunch
-
Does trench width conform with TCCS spec?
-
Is base of trench free from rocks and loose material?
Pipe Installation
-
Does bedding material conform with TCCS Standards?
-
Are the correct revision of drawings being used by the contractor?
-
Are the property ties installed correctly and minimum/maximum depths at boundary adhered to?
-
Have rocker pipes been installed and do they conform with Standards?
-
Is trench backfill as per standards?
Structures
-
Have correct structures been installed as per design drawing?
-
Are step irons in compliance with Standards?
-
Has correct class of lid been installed?
-
Is the structure finished appropriately with no dags or sharp edges?