  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1.0 Previous Audit

  • Has a previous audit been completed?

  • Date of previous audit

  • Has a copy been forwarded to the subcontractor for review?

2.0 Site General

  • Sign in procedures followed?

  • Is the technician Inducted?

  • Company stickers on equipment?

3.0 Log Book/s and Essential Services Folder

  • Is there an Essential Services Log Folder (ESLF) on site?

  • Are the system logbooks present?

  • Fire Indicator Panel

  • Fire Sprinkler System

  • Fire Pump Set

  • Emergency Lighting

  • EWIS

  • Fire Doors

  • Are the system logbooks up to date?

  • Fire Indicator Panel

  • Fire Sprinkler System

  • Fire Pump Set

  • Emergency Lighting

  • EWIS

  • Fire Doors

  • Is the ESLF up to date?

  • Is the log book and/or ESLF Trojan branded?

  • Is the log book and/or ESLF in good condition and protected from elements?

4.0 Fire Indicator Panel

  • Fire Indicator Panel

  • Does the display read "Trojan Fire"?

  • Is the control room/FIP clean an tidy?

  • Are there two copies of the block plans?

  • Is the Battery condition/age within acceptable levels?

  • Date of battery installation

  • Are there any faults present on the system?<br>

  • Have all defects been reported and followed up?

  • Is the system safe and operational?

  • Was the test carried out as per AS1851?

5.0 EWIS/OWS

  • EWIS/OWS Panel

  • Is the Cabinet clean and tidy?<br>

  • Any defects present or reported?

  • Is the battery age and condition within acceptable levels?

  • Date of battery installation

  • Is the system safe and operational?

  • Was the test carried out as per AS1851?

6.0 Sprinkler Systems

  • Sprinkler Control Valves

  • How many valve sets are installed?

  • Is the sprinkler valve room/s clean and tidy?

  • Are all of the stop valves chained and padlocked where appropriate?

  • Is the sprinkler block plan present and up to date?

  • Does the system show ANY signs of leaks?

  • Are the appropriate signs and labels in place?

  • Any defects reported or present

  • Is the system safe and operational?

  • Was the system test carried out as per AS1851?

7.0 Fire Pump Sets

  • Fire Pump/s

  • Diesel Fire Pumps Installed

  • Electric Pump/s Installed

  • Jacking Pump/s Installed

  • Are the batteries in good condition?

  • Are the batteries within age limitations, ie <5yrs?

  • Installation Date

  • Compliant AGM batteries installed on diesel fire pumps?

  • AGM Batteries

  • Was the coolant level checked?

  • Was the oil level checked?

  • Is the fuel level/s maintained?

  • Room is clean and tidy?

  • Shed/room is structurally sound?

  • Lighting is adequate to meet safety requirements?

  • Engine service history available for diesel fire pump?

  • Date of previous service

  • Any defects present or reported?

  • Is the pump set safe and operational?

  • Was the test carried out as per AS1851?

8.0 Water Storage Tanks

  • Water Storage Tanks

  • Is the overall tank condition sound?

  • Were the level indicators checked and moving freely?

  • Valves appropriately chained and padlocked?

  • Inspection history available?

  • Any defects reported or present?

9.0 Fire Extinguishers/Fire Hose Reels/Fire Blankets

  • Is an asset register available?

  • Date of last update

  • Service tags in date?

  • Next service due

  • Equipment clean and tidy?

  • "Trojan Fire" stickers in place?

  • Are any fire hose reel/fire hydrant cabinets used for storage?

  • All cabinets sign written correctly?

  • Any defects reported or present?

  • Is the installation safe and operational?

10.0 Booster Cabinet/s

  • Booster Cabinet/s

  • Is/are the booster/s sign written correctly?

  • Block plans present and up to date?

  • Hydrant block plans

  • Service tags in date?

  • Next service due?

  • Cabinet clean, tidy and free from vermin/insects/spiders?

  • Any defects reported or present?

  • Is the installation safe and operational?

11.0 Hydrants

  • Is the general condition of the installation acceptable?

  • Service tags in date?

  • Next service due?

  • Are all hydrant caps in place?

  • Any defects present or reported?

  • Is the installation safe and operational?

  • Was the test carried out as per AS1851?

12.0 Gaseous Suppression Systems

  • Number of cylinders installed

  • Cylinders within date?

  • Cylinder pressure test due date

  • Any defects reported or present?

  • Is the installation safe and operational?

  • Was the test carried out as per AS1851?

Summary

  • Signature of Auditee

  • Name

  • Signature of Auditor

  • Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.