Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Job Site Set up
-
Have the minimum number of advanced warning signs been installed
-
Is the taper the correct length for the posted speed limit
-
Is the buffer space the correct length
-
Is the buffer space clear of all construction vehicles and equipment
-
Are the construction vehicles and equipment contained within the work space
-
Is the termination area taper the correct length
-
Are the channeling devices spaced appropriately for the speed conditions
-
Are the number of channeling devices correct per MUTCD
Flaggers
-
Are the appropriate amount of flaggers on site as required for the traffic control plan or as determined by the on site Inspector / Contractor
-
When flaggers are used, the last sign prior to the flagger must be the flagger ahead sign. Is this true for this job site set up
-
Do the flaggers have an escape route
-
Are the flaggers certified to control traffic
-
Are the flaggers wearing the appropriate PPE? Minimum class 2 for day time operations and class 3 for both night projects or DOT controlled roads
-
Have the flaggers been instructed on the proper way to guide EMS vehicles safely through the job site
-
Is there a designated breaker on site
-
Are there restrooms available on site
-
Are the flaggers positioned perpendicular to traffic