Title Page
-
Conducted on
-
ELECTRICIANS NAME
-
COMPANY NAME
-
TOW NUMBER
-
NODE SITE ID
-
SITE ADDRESS.
SITE INFORMATION
-
WHO IS THE POWER UTILITY COMPANY.
-
WHATE STATE IS THIS AUDIT CONDUCTED IN?
-
IS THE SWITCHBOARD, PIT OR POLE MOUNTED?
-
WHAT IS THE METER NMI NUMBER.
-
IS THE METER, METERED OR UNMETERED?
PREPARE SITE
-
HAS FTTN NOC BEEN ADVISED WORK IS BEING UNDERTAKEN AT SITE.<br><br>
-
HAVE YOU CONDUCTED A HSE RISK ASSESSMENT AND PRE START CHECKLIST.
-
HAS A SAFETY PRE START BEEN CONDUCTED AND APPROPRIATE CONTROLS BEEN IMPLEMENTED.
CONFIRM BACKUP SUPPLY AND ISOLATE NORMAL SUPPLY.
-
IS THE BATTERY CAPACITY SUFFICIENT TO COMPLETE THE WORK WITHOUT LOSS OF SERVICE?<br><br><br>
-
HAVE YOU ISOLATED AT THE MAIN SWITCHBOARD FUSE?
-
HAVE YOU TESTED AND CONFIRMED OUTGOING SUBCIRCUIT AT MAIN SWITCHBOARD IS ISOLATED?
-
HAVE YOU TESTED AT THE CABINET, TO CONFIRM THE INCOMING SUPPLY IS ISOLATED?
REWIRE CABINET
-
HAS ALL WIRING BEEN COMPLETED AS PER NBN-CON-TIB-3374?
-
TAKE A PHOTO OF GENERATOR N - E BOND CABLE LABELED AND CONNECTED TO CABINET PE BAR.
-
TAKE A PHOTO OF GENERATOR CHANGEOVER SWITCH WIRING CHANGE.
-
TAKE A PHOTO OF THE GENERATOR CHANGEOVER SWITCH COVER LABELED TIB - 3374 COMPLIANT.
-
CONFIRM SIZE OF MAINS AND MAIN ECC
REPLACE RCBO
-
REMOVE EXISTING RCBO AND NOTE (MANUFACTURER, RATING AND MODEL)
-
TAKE A PHOTO OF THE SWITCHBOARD WITH EXISTING RCBO REMOVED
-
INSTALL APPROVED SI RCBO AND NOTE (MANUFACTURER, RATING AND MODEL)
-
TAKE A PHOTO OF THE SWITCHBOARD WITH SI RCBO INSTALLED
-
HAS ALL TESTING BEEN COMPLETED?
ENERGISE, TEST AND SUBMIT
-
HAVE YOU RE-CONNECT THE SUPPLY (AT FUSE IN MAIN SWITCHBOARD)?
-
ENSURE SUPPLY IS WORKING AND CABINET IS POWERED ON.
-
COMPLETE REMAINING TESTS, I.E. THOSE THAT REQUIRE SUPPLY TO BE AVAILABLE.
-
HAVE YOU REPLACED THE EXISTING WIRING DIAGRAM WITH NEW ONE?
-
PHOTOGRAPH OF UPDATED SCHEMATIC (TO BE PLACED IN CABINET DOCUMENT HOLDER)
-
CONTACT FTTN NOC TO ADVISE JOB IS COMPLETE PRIOR TO LEAVING SITE.
-
WILL ALL ARTEFACTS BE SUBMITTED TO NBN .
-
TAKE A PHOTO OF COMPLETED EXTERNAL (POLE,PILLAR OR PIT) SWITCHBOARD
-
FOR POLE-MOUNTED SWITCHBOARDS: PHOTO OF CONDUIT AT TOP OF POLE (I.E. AT POINT OF CONNECTION TO MAINS)
ELECTRICAL INSPECTION
-
HAS THE ELECTRICAL INSPECTOR BEEN ADVISED SITE IS READY FOR INSPECTION
-
PHOTOGRAPH OR SCAN OF CERTIFICATE OF ELECTRICAL SAFETY
-
ADDITIONAL COMMENTS
SIGN OFF
-
ELECTRICIANS NAME AND SIGNATURE