Information

  • Project Manager/Job number/Date (John Doe 8111334 01212103)

  • Client-City, State /Month/Safety Report (Chuys-Richmond, VA January Safety Report)

  • Add location
  • Conducted on

  • Prepared by

Program Administration

  • Is the OSHA and government regulations posters hung up?

  • Picture of posters

  • Has the two week safety checklist been completed?

  • Is Parkway safety book on site ?

  • Are emergency telephone numbers posted?

  • Is drinking water available on site?

  • Is the OSHA 300 log posted Feb 1-Apr 30?

Hazard Communications

  • Are MSDS forms for Parkway purchased items available on site?

  • Do subcontractors have their MSDS sheets on site?

  • Deficiencies Found

Medical

  • Is first aid kit available and properly stocked?

  • Picture of first aid kit

  • Deficiencies Found

  • Is there at least one employee with a current first aid card on the job site?

Fire prevention and protection

  • Are the proper type and number of fire extinguishers available and in operating condition?

  • Picture of fire extinguisher

  • Is the fire extinguisher tag current?

  • Are flammable liquids stored in metal safety cans and properlylabeled?

  • Are all work areas clear of combustible scraps and debris?

  • Are fire lanes free of debris so emergency vehicles can enter the site?

  • Are monthly inspections on the fire extinguishers being done and recorded?

  • Deficiencies Found

Personal protective equipment

  • Are hardhats being worn at all times?

  • Picture of hardhats being worn

  • Is eye and face protection being used when needed?

  • Is proper footwear being worn by all personnel?

  • Is hearing protection being used when needed?

  • Is respiratory protection being used when needed?

  • Is fall protection being used when required?

  • Are personnel using gloves when handling sharp or rough material?

  • Deficiencies Found

  • Are rubber gloves with protectors-insulators being used when needed?

  • Deficiencies Found

Ladders

  • Are ladder inspections being performed and records being kept?

  • Is the proper ladder for the job being used?

  • Picture of ladders

  • Are ladders in good condition (no missing or broken rungs)?

  • Are ladders tied off or secured at top?

  • Do siderails extend 36 inches above the top of opening or has a handgrip been put in place 36 inches high?

  • Are there safety cleats/shoes on bottom of ladders?

  • Are ladders being leaned at a 4 to 1 ratio?

  • Are step ladders fully open when in use?

  • Are defective ladders immediately withdrawn from service and marked "do not use" or destroyed?

  • Deficiencies Found

Scaffolding

  • Has scaffolding been erected correctly under the supervision of a competent person?

  • Picture of scaffolding

  • Do rolling scaffolds have locking wheels and are locked when used?

  • Are scaffolds fully planked?

  • Are toeboards and guardrails in place on scaffolding?

  • Is scaffold erected on a firm and substantial surface?

  • Is a signed competent person form onsite?

  • Deficiencies Found

  • Have employees who use the scaffold been trained in its safe use?

  • Deficiencies Found

Tools

  • Are cords in good condition not frayed, damaged or missing ground pins?

  • Picture of tools

  • Are handles, shields, and guards on all tools in good condition and being used correctly?

  • Are hoses on air or hydraulic tools in good condition and attached securely?

  • Deficiencies Found

Electrical

  • Are weekly GFCI testing and inspections being done and records being kept?

  • Are all switch panels and devices that are energized marked and guarded to prevent accidental contact?

  • Are lockout devices used on all circuits that could become energized while work is being performed?

  • Are temporary circuits properly guarded and grounded with GFCI protection?

  • Are all temporary lights in work areas and supply trailers protected with guard? Are guards closed, bulbs in place, and not burned out?

  • Picture of temp lighting

  • No bent or broken ground prongs on chords?

  • Are there any visual signs of outlet overloading?

  • Are temporary receptacles affixed to walls or stands?

  • Are extension cords not damaged, frayed, missing ground pins, and are of the three wire type?

  • Are extension cords being correctly used? They are not fastened with staples, hung from nails, or suspended by wire?

  • Are OSHA approved type extension cords being used on job site?

  • Is temporary lighting hung by non-conductive material?

  • Deficiencies Found

Trenching and excavation

  • Do the subs have a competent person on site when someone is in the trench?

  • Has the competent person form for trenches been signed?

  • Are all trenches and excavations properly barricaded?

  • Picture of trenches

  • Is all excavated material properly stored 2 feet or more from edge?

  • In trenches more than 4 feet deep, are ladders within 25 feet travel distance?

  • Is proper sloping and/or shoring being used for trenches over 5 feet deep?

  • Deficiencies Found

  • Is there a confined space program for subcontractor?

  • Is trenching being inspected on a daily basis?

Welding

  • Have all cylinders been chained upright with valve caps in place?

  • Are hoses and gauges in good working order?

  • Are all shields, helmets and goggles in place and in good condition?

  • Picture of PPE for Welding

  • Has a hot work permit been obtained and on-site?

  • Is a fire extinguisher within range of welding work?

  • Are fire blankets being used where needed?

  • Are inspections for fire hazards be done when welding is completed?

  • Deficiencies Found

General

  • Are competent person forms for each sub on site?

  • Are all openings in floors and walls through which employees can fall protected?

  • Are all holes covered, secured, and marked?

  • Are rebar caps in place when needed?

  • Picture of rebar caps

  • Are sanitary systems and supplies available and adequate?

  • Is proper personal protective equipment being used when required?

  • Are Hardhats being worn at all times; until the ceilings throughout the building are completely finished; all overhead hazards and hazards where there is the possibility of injury to the head from impact from falling objects no longer exists?

  • Is adequate lighting provided in all work areas?

  • Are proper housekeeping procedures being performed daily?

  • Are all tools and materials properly stored and placed so as not to produce slip or trip hazards?

  • Is jobsite secure so that unauthorized persons are not at danger from tools, equipment and materials?

  • Are subcontractors being notified in writing when violations are found?

  • Are copies of notifications being kept in jobsite safety manual?

  • Have subcontractors been notified of any discrepancies?

  • Deficiencies Found

  • Notes

  • Subcontractors on site today

  • Picture of violation

  • Picture of violation

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.