Information
-
Project Manager/Job number/Date (John Doe 8111334 01212103)
-
Client-City, State /Month/Safety Report (Chuys-Richmond, VA January Safety Report)
-
Add location
-
Conducted on
-
Prepared by
Program Administration
-
Is the OSHA and government regulations posters hung up?
-
Picture of posters
-
Has the two week safety checklist been completed?
-
Is Parkway safety book on site ?
-
Are emergency telephone numbers posted?
-
Is drinking water available on site?
-
Is the OSHA 300 log posted Feb 1-Apr 30?
Hazard Communications
-
Are MSDS forms for Parkway purchased items available on site?
-
Do subcontractors have their MSDS sheets on site?
-
Deficiencies Found
Medical
-
Is first aid kit available and properly stocked?
-
Picture of first aid kit
-
Deficiencies Found
-
Is there at least one employee with a current first aid card on the job site?
Fire prevention and protection
-
Are the proper type and number of fire extinguishers available and in operating condition?
-
Picture of fire extinguisher
-
Is the fire extinguisher tag current?
-
Are flammable liquids stored in metal safety cans and properlylabeled?
-
Are all work areas clear of combustible scraps and debris?
-
Are fire lanes free of debris so emergency vehicles can enter the site?
-
Are monthly inspections on the fire extinguishers being done and recorded?
-
Deficiencies Found
Personal protective equipment
-
Are hardhats being worn at all times?
-
Picture of hardhats being worn
-
Is eye and face protection being used when needed?
-
Is proper footwear being worn by all personnel?
-
Is hearing protection being used when needed?
-
Is respiratory protection being used when needed?
-
Is fall protection being used when required?
-
Are personnel using gloves when handling sharp or rough material?
-
Deficiencies Found
-
Are rubber gloves with protectors-insulators being used when needed?
-
Deficiencies Found
Ladders
-
Are ladder inspections being performed and records being kept?
-
Is the proper ladder for the job being used?
-
Picture of ladders
-
Are ladders in good condition (no missing or broken rungs)?
-
Are ladders tied off or secured at top?
-
Do siderails extend 36 inches above the top of opening or has a handgrip been put in place 36 inches high?
-
Are there safety cleats/shoes on bottom of ladders?
-
Are ladders being leaned at a 4 to 1 ratio?
-
Are step ladders fully open when in use?
-
Are defective ladders immediately withdrawn from service and marked "do not use" or destroyed?
-
Deficiencies Found
Scaffolding
-
Has scaffolding been erected correctly under the supervision of a competent person?
-
Picture of scaffolding
-
Do rolling scaffolds have locking wheels and are locked when used?
-
Are scaffolds fully planked?
-
Are toeboards and guardrails in place on scaffolding?
-
Is scaffold erected on a firm and substantial surface?
-
Is a signed competent person form onsite?
-
Deficiencies Found
-
Have employees who use the scaffold been trained in its safe use?
-
Deficiencies Found
Tools
-
Are cords in good condition not frayed, damaged or missing ground pins?
-
Picture of tools
-
Are handles, shields, and guards on all tools in good condition and being used correctly?
-
Are hoses on air or hydraulic tools in good condition and attached securely?
-
Deficiencies Found
Electrical
-
Are weekly GFCI testing and inspections being done and records being kept?
-
Are all switch panels and devices that are energized marked and guarded to prevent accidental contact?
-
Are lockout devices used on all circuits that could become energized while work is being performed?
-
Are temporary circuits properly guarded and grounded with GFCI protection?
-
Are all temporary lights in work areas and supply trailers protected with guard? Are guards closed, bulbs in place, and not burned out?
-
Picture of temp lighting
-
No bent or broken ground prongs on chords?
-
Are there any visual signs of outlet overloading?
-
Are temporary receptacles affixed to walls or stands?
-
Are extension cords not damaged, frayed, missing ground pins, and are of the three wire type?
-
Are extension cords being correctly used? They are not fastened with staples, hung from nails, or suspended by wire?
-
Are OSHA approved type extension cords being used on job site?
-
Is temporary lighting hung by non-conductive material?
-
Deficiencies Found
Trenching and excavation
-
Do the subs have a competent person on site when someone is in the trench?
-
Has the competent person form for trenches been signed?
-
Are all trenches and excavations properly barricaded?
-
Picture of trenches
-
Is all excavated material properly stored 2 feet or more from edge?
-
In trenches more than 4 feet deep, are ladders within 25 feet travel distance?
-
Is proper sloping and/or shoring being used for trenches over 5 feet deep?
-
Deficiencies Found
-
Is there a confined space program for subcontractor?
-
Is trenching being inspected on a daily basis?
Welding
-
Have all cylinders been chained upright with valve caps in place?
-
Are hoses and gauges in good working order?
-
Are all shields, helmets and goggles in place and in good condition?
-
Picture of PPE for Welding
-
Has a hot work permit been obtained and on-site?
-
Is a fire extinguisher within range of welding work?
-
Are fire blankets being used where needed?
-
Are inspections for fire hazards be done when welding is completed?
-
Deficiencies Found
General
-
Are competent person forms for each sub on site?
-
Are all openings in floors and walls through which employees can fall protected?
-
Are all holes covered, secured, and marked?
-
Are rebar caps in place when needed?
-
Picture of rebar caps
-
Are sanitary systems and supplies available and adequate?
-
Is proper personal protective equipment being used when required?
-
Are Hardhats being worn at all times; until the ceilings throughout the building are completely finished; all overhead hazards and hazards where there is the possibility of injury to the head from impact from falling objects no longer exists?
-
Is adequate lighting provided in all work areas?
-
Are proper housekeeping procedures being performed daily?
-
Are all tools and materials properly stored and placed so as not to produce slip or trip hazards?
-
Is jobsite secure so that unauthorized persons are not at danger from tools, equipment and materials?
-
Are subcontractors being notified in writing when violations are found?
-
Are copies of notifications being kept in jobsite safety manual?
-
Have subcontractors been notified of any discrepancies?
-
Deficiencies Found
-
Notes
-
Subcontractors on site today
-
Picture of violation
-
Picture of violation