Title Page
-
Site conducted
-
Name
-
Conducted on
-
Prepared by
Preliminaries
-
Name:
-
Company/Branch:
-
Line Manager:
-
Direct Employee/ Agency:
-
Site Address:
-
Asbestos material:
-
LW/NNLW/NL:
-
Task to be undertaken “at time of assessment”
-
Site Set Up
-
Enclosure construction
-
Removal
-
Fine Clean
-
Waste Removal
-
Other
1.0 RPE + PPE
-
(1= Poor, 2=Improvement Needed, 3=Good,4=Excellent)
-
1.1 RPE Checks (Inspections, Documentation, storage, reporting)
-
1.2 Appropriate PPE ref POW, all ops clean shaven etc
2.0 Site Set Up
-
2.1 Assessment of site conditions against POW, ACM’s to remain etc
-
2.2 Amendments appropriate, accurate, auditable, in the agreed remit and schedule of works
-
2.3 DCU, erection of enclosure/air/bag in line with POW and site RA
-
2.4 Positioning of signage, CCTV, Viewing Panels
-
2.5 Site controlled, clean, orderly with appropriate records made
3.0 Decontamination Procedures
-
3.1 Correct entry and exit to/from DCU and through airlock
-
3.2 DCU checks, waste disposal, supplies etc
4.0 Strip Techniques – Correct to POW and Client Specification:
-
4.1 Mist Spraying
-
4.2 Shadow Vacuuming
-
4.3 Multi Point Injection
-
4.4 Wrap and Cut/Glove Bag
-
4.5 Quill Falcon/water jetting
-
4.6 General Use of Equipment
5.0 Waste Procedures
-
5.1 Bagging and transiting of Waste
-
5.2 Bag lock Procedures/ justification if not present
-
5.3 Waste storage, transport and disposal arrangements
6.0 Final Clean
-
6.1 Vacs, Airlock – Enclosure
-
6.2 Use of Tools and Consumables
-
6.3 Fine Clean (appropriate for 4SC)
7.0 General
-
7.1 Housekeeping
-
7.2 Appearance
-
7.3 Attitude
-
7.4 Behavior
-
7.5 H&S - Hazard Perception, risk assessment etc
-
7.6 Effective teamwork and communication
-
7.7 Punctuality
-
7.8 Site documentation and certification
-
7.9 Personal Certification
-
7.10 CDM/Principle contractor requirements
-
7.11 3rd party communication (analyst, contractors, client etc)