Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Scaffold Audit

General Information

  • Permit #:

  • Name of Scaffold Erector:

  • Installation Date:

  • Expiration Date:

  • Renter's Name

  • Phone #:

  • Drawing on Site for Inspection?

Specific Information

  • Scaffold Height:

  • Number of Platforms Decked

  • Are there signs on the parapets?

Maintenance Information

  • Are the base plates & mud sills secured?

  • Are all the scaffold pins & bolts installed?

  • Are the legs and poles plumb, braced and not displaced?

  • Are cross braces fully attached, not bent, and not missing?

  • Are tie-ins correctly spaced, properly secured & the correct amount?

  • Are pipe clamps tight?

  • Are window jacks tight?

  • Are all the planks secured?

  • Are decking and planks in good condition?

  • Is deck fully planked?

  • Are there any gaps or open spaces (> 1") on decking?

  • Are the guardrails & toe boards secured at all places where required?

  • Is the netting extension of full length and height?

  • Is the netting secured?

  • Is the parapet the proper height and secured?

  • Are the lights working?

  • Is the deck clean and free of debris?

Approval

  • Signature:

  • Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.