Title Page
-
Document No.
-
Block name
-
Contractor
-
Grower/Manager
-
Conducted on
-
Auditor
-
Location
-
Contractor representative / Grower respentative
Harvest type
-
Choose harvest type
Harvest Status
-
Choose harvest status
-
If suspended please indicate why
Administration
Administration
-
Is an up to date copy of the THP available at site
-
Are all of the crew signed onto THP including truck drivers and other visitors
-
Copy of the crew risk assessment available
-
Are there any hazards not previously identified
-
Copy of other relevant documents ie Koala Management Procedure available ?
Stakeholder Or Public Participation
-
Has there been any public interaction or interest in harvesting activities.
-
Have any issues from previous audits been completed to grower representative satisfaction if applicable
-
Action required and by whom
-
Select date
Production and Quality
Production and Quality
-
Is all merchantable timber being processed.
-
Stump heights within specification and kept to a minimum
-
Are log dumps clear of contaminants and debris
-
Are log dumps correctly positioned ie not in drains or under known koala inhabited trees
-
Is the contractor complying with code ie wet weather restrictions
-
Is cording being used appropriately if applicable
-
Are log trucks being loaded to quality specification. No excessive bark or debris : logs with flares, bends or double leaders: no dirt or sand
-
Are log dumps being stacked appropriately and safely
-
Are chip sites clear of excessive slash
-
Are snig tracks appropriately used with minimal slash build up
-
Are slash management prescriptions being followed as per THP<br>
-
Is the contractor managing wood supply appropriately ie no excessive wood on break or in bush
-
Are logs being rotated to prevent logs being cut for greater than 7 days prior to processing
-
Any further comments or observations
Environment
Environment
-
Is the contractor working in the most suitable area of the coupe for the ground/weather conditions
-
Are staff aware of any special values on site as per THP
-
Are staff aware of controls for special values ie felling away from remnant vegetation
-
Are all fuels and oils stored correctly at least 50 m away from water courses, drains and dams
-
Are streams, waterways and drainage lines clear of sediment and harvest debris
-
Are temporary crossings appropriately used ie use of cording or slash to prevent damage to stream banks and drains
-
If temporary crossing points have been created are they correctly positioned and have they been approved by SWF harvest personel
-
If temporary crossing points have been created has slash and other debris been cleared prior to leaving site
-
Have buffers around streams and waterways been observed by all staff
-
Has rutting been minimised <20 cm
-
Is the site free of rubbish ie rags, oil drums etc
Flora and Fauna
Flora and Fauna
-
Are koala management procedures being applied as required
-
Do all animals observed at time of audit appear healthy and without injury
-
Koala observation sheets checked to ensure compliance
-
Other animals maybe be present within plantation ie sugar gliders, are prescriptions being followed as per koala management
-
Have all special values been preserved
OHS
Occupational Health and Safety
-
New risks (observed by contractor)
-
Are all staff following safety procedures ie truck drivers in safe zones while loading
-
Are all staff wearing appropriate PPE
-
Are there sufficient first aid kits on site
-
Are the coupe information and warning signs on place and effective
-
Have all incidents and near misses been reported by the crew. This includes near misses in regards to koala management
-
Are all personnel appropriately trained in SWF procedures
-
Is the contractor complying with the fire protocols ie sufficient fire equipment on site and in good working order
-
Is the contractor monitoring weather conditions in regards to fire risk days
-
Have any new issues been raised by neighbours, shires or DELWP
-
Are truck drivers using the prescribed cartage route as per THP
Roading an infrastructure
Roading and infrastructure.
-
Are all roads and infrastructure in good repair
-
Works required
-
By whom
-
By when
-
Are all culverts clear and free draining
-
Works required
-
By whom
-
By when
-
Are all gates and access clear and in good repair
-
Are mud or other roading materials being pulled onto shire roads
Sign off
Sign off
-
Any issues not addressed in audit
- Enter comments from audit
-
Comments
Enter photos from audit
-
Enter photos
Any corrective actions
-
Corrective actions
-
By whom
-
By when
-
SWF Representative
-
Contractor
-
Landowner