Title Page
-
Document No.
-
Grower
-
Block
-
Conducted on
-
Prepared by
-
Location
-
Contractor
- Moreland
- Tabeel
- Merrett
- Dohnt
- Tabeel chip
- Other
-
Contractor / Grower representative
Administration
-
Harvest type
-
Harvest complete or suspended
-
Reason
-
Select date
Utilisation Quality Operational
-
Has all merchantable timber been removed from site
-
Has slash management as per grower requirements been followed
-
Has the contractor fulfilled all obligations before leaving site
-
Personal responsible
-
By when
Roading infrastructure
Roading and infrastructure
-
All roading and infrastructure left in suitable condition for handover
-
If further works are required who is responsible
-
By when
Environment
-
Has all rubbish including rags, drums etc been removed from site
-
Have all special values been preserved
-
Post harvest koala survey completed
-
Person responsible
-
By when
Sign off
Sign off
-
Enter comments
- Photos
-
Add media
Corrective actions to be raised
-
Contractor rep
-
Grower representative
-
SWF representative