Information
-
Permit To Work No.
-
PTW Description
-
SITE CODE
-
Performing Engineer
-
Conducted on
SECTION I: Details of Proposed Work
-
System/Sub-System Impacted
- BMS
- Security System
- Electrical
- Mechanical Systems
- Fire Systems
- Power Systems
- HVAC
- Backup Power Systems
- Generators
- Chiller Systems
- Structured Cabling Systems
- Piping Systems
- Pressure Set Pumps
-
Floor Level
- L1
- L2
- L3
- Mid Plant 2
- Mid Plant 1
- LB
- UB
- MDF ROOMS UB
- Roof Plant 5
- Roof Plant 6
PROPOSED SCHEDULE OF WORK
-
Proposed Schedule of Works
Start Date and Time
-
Proposed Start Date and Time
-
Proposed End Date and Time
Brief Description of Proposed Work
-
PTW Category
- Scheduled Maintenance
- Service Callout
- Carrier Works
- Customer Third-Party Contractor
- Approved LAAN Works
- Others
-
Please provide Cabling Licence Details
-
Photographic evidence of cabling license registration details (Optional)
RISK ASSESSMENT
SECTION II: RISK ASSESSMENT
-
Risk Assessment Table
-
Risk Score
-
Documentations Provided
- SWMS
- Maintenance Script
- Switch Tag
- Hot Works Permit
- Approved LAAN
- Certificate of Current Insurance
- Current NSW Work Cover Insurance Certificate
- Cabling License Registration Details
- Others
-
Media/Attachments (Optional) * Due to app limitation, it is recommended to submit documents ticked above separate from this App. Please have these documentations ready when required by the Approver. IMPORTANT: All documentations provided must be current.
ATTENDEES
SECTION III: CONTRACTOR DETAILS
-
Contact Details
Contact
-
Full Name
-
Company
-
Immediate Contact Details while onsite (For emergency purposes)
Constraints (if any)
-
Prerequisites before start of work(if any)
-
Date and Time
APPROVALS
APPROVAL
-
Work Authorisation (Work Approval in Accordance with Section 3, above):
The procedures, control measures and precautions appropriate for the safe execution of hot work have been implemented and the persons required to work have been advised of and understand the requirements of the Risk Assessment & Hot Work Permit.
The personnel listed in above may access the areas identified in Section 1.
Cloudspace Facilities Engineer
-
Signed
Senior Management Approval
-
Signed
-
IMPORTANT: Document only valid with signature from senior management.