Information
-
Audit Title:
-
Site Name & Number:
-
Client:
-
Conducted on:
-
Prepared by:
-
Accompanied by:
-
Location:
-
Company Division:
- Demolition
- Gasholder Demolition
- Waldens Yard
- Pinden
- AWS
Project Overview
-
Overview of current Works:
Site Assessment
-
External Site Aesthetics: <br>(Eg. site image, hoarding condition, external signage etc)
-
Welfare Setup: <br>(Eg. condition, cleanliness, suitability etc)
-
Safety Signage: <br>(Eg - up to date, good level of displayed information, clearly define high risk areas)
-
Onsite Plant:<br>(Eg. condition, appearance etc)
-
Access / Egress Routes: <br>(Eg. segregated, suitably signed, well lit, underfoot conditions etc)<br>
-
Housekeeping (waste not stockpiled, storage for tools and equipment, materials suitably stored, waste segregated)
-
PPE Compliance: <br>(Eg. correct PPE being worn)
-
Spill Protection: <br>(Eg. good provisions, suitable locations etc)
-
Behaviour of staff on site: (Eg. Staff working safety as per procedures & instruction)
Non-Conformance Observations
-
NCO's:
NCO
-
Safety Interations
-
Interaction:
Safety Moment
-
Operative Name / Group Addressed:
-
Safety Discussion Topic:
Positive Observations
-
Positive Observation:
Positive observation
-
Inspection Sign off
-
Add signature