Information
-
Project Name & Number:
-
Client:
-
Conducted on:
-
Prepared by:
-
Accompanied by:
-
Location:
-
Contractors on Site:
-
Company Division:
- Demolition
- Gasholder Demolition
- Asbestos Removal
Summary of current Works on Site:
-
Summary:
Previous Inspection
-
Have items from the previous inspection report been actioned?
-
If No, state what actions are not completed and reasons why?
First Aid
-
Have accidents been entered in the site incident book?
-
Details of any new reported incidents:
-
1st aid kits present and in date?
-
Sufficient 1st aiders present onsite with details displayed?
-
Recommended 1st aider ratio:
1 EFAW or FAW person per 50 people or part thereof
Displayed Information
-
Is a signed/ in date Health And Safety Policy displayed?<br>
-
Other Company Policy’s displayed?
-
Have the Insurances certificates been displayed?
-
Company Accreditation certificate displayed?
-
Asbestos Notification displayed?
-
F10 displayed & up to date?
-
Section 80/81 available on site?
-
Fire Plan displayed & up to date?
-
A&E Arrangements displayed & up to date?
-
Traffic Plan displayed & up to date?
-
Welfare Plan displayed & up to date?
-
Dewatering Plan displayed & up to date?
-
SHEQ Alerts displayed & relevant?
Project paperwork
-
Have all staff been inducted?
-
Are Risk Assessments & Method Statements present to cover all works?
-
Have Risk Assessments & Method Statements been briefed out?
-
Have SSOW been produced for all significant aspects of the RAMS?
-
Have Daily Pre-Start Briefings been conducted?
-
Asbestos Survey present onsite and communicated to staff?
-
Have all sub-contractors supplied suitable RAMS and have been approved by SBS?
Site Welfare
-
Suitable number of toilets onsite?
-
Men only (mains water toilets)
1-15 = 1 toilet and 1 urinal
16-30 = 2 toilet and 1 urinal
31- 45 = 2 toilet and 2 urinal
46-60 = 3 toilet and 2 urinal -
Warm water supplied for washing?
-
Adequate supplies of soap & hand drying provisions etc?
-
Canteen facilities present - including microwave, fridge, drinking water and kettle?
-
Drying room present with sufficient cloths hanging/storage?
-
All areas supplied with suitable heating & lighting?
-
Welfare facilities clean and in good condition?
COSHH
-
Have relevant COSHH Assessments been completed?
-
Are all COSHH Assessments been briefed out to staff on site?
-
Are MSDS available as a hard copy or electronic copy?
-
Are all COSHH items suitably stored on site?
Fire Precautions
-
Fire risk assessment completed?
-
Assembly Point present and demarcated?
-
Means of raising fire alarm adequate & can be heard over site noise?
-
Sufficient number of Fire Marshals on site & suitably trained?
-
Fire Drill completed as per requirements?
-
Fire Escape Routes clearly defined and signed?
-
Fire Point inspection recorded weekly & easily accessible?
-
Fire Points present at relevant areas; welfare area; refuel area; flammable store; etc?
-
Fire Extinguishers in date & seals intact?
-
Emergency lighting present?
Safety Signage
-
Site Entrance suitably signed?
-
Demolition Area access points clearly identified?
-
Signage displayed at work areas identifying risks (e.g. No access, high noise areas etc)?
Work at Height
-
Is a Permit to Work at Height being utilised & adhered to?
-
Are Ladders used suitable (class 1), tied in, and free from defect?
-
Have Podiums been inspected with Tag Present and are suitable for use?
-
Have all Towers been inspected with Tag Present and are suitable for use?
-
Is a PASMA trained competent person available to supervise Tower builds?
-
Are all fixed Scaffolds suitable for use ?
-
Toe boards fitted (150mm)
Intermediate rail (no more than 470mm above toe board)
Top rail (950mm)
All ladders secured -
Are Haki stairs suitable? (no gaps in handrail - see note above)
-
Have Scaffold Inspections been completed with Scaff Tag displayed?
-
Are any Scaffolds overloaded?
-
Are works on leading edges being undertaken? If yes, have suitable fall protection been established?
-
Are Harness & Lanyards inspected as per requirements, with Certification on site?
-
Are all Harness & Lanyards free from defect?
-
Are anchor points suitable?
-
Are there suitable ERP available? & Staff trained to undertake the rescue?
-
Is fixed edge protection present as required?
-
Is all non-fixed edge protection positioned at least 1.5m from the edge with signage displayed?
Excavations & Voids
-
Permit to Break Ground or Enter in operation and up to date?
-
All sides suitably supported or assessed as suitable?
-
Access into / out of the Excavation or Void is suitable? (i.e. fixed ladder)
-
Stock pilling of materials at least 2 metres from the Excavation / Void?
-
If the Excavation / Void requires a Daily Temporary Works inspection, is it completed correctly?
-
Is suitable Safety Signage displayed warning of Risks? (i.e. Deep Water, Sheer Drop, No Unauthorised Persons.)
Plant and Machinery
-
Are Operators completing a recorded Daily Inspection?
-
Are all Plant & Equipment inspected weekly under PUWER?
-
Are all Plant Operators suitably trained?
-
All Plant & Machinery in good working order? Are defects being recorded?
-
Are attachments connected correctly?
-
Are Plant Operating Areas established with Banksman provided?
Lifting Equipment and Accessories
-
All Lifting Equipment & Accessories have valid Thorough Inspection certificate?
-
Are all Lifting Equipment & Accessories inspected weekly under LOLER?<br>(Inspection to be signed off by a CPCS Lifting Competent person.)
-
Equipment is free from defect & Stored correctly?
-
All Lifting Equipment & Accessories have an identified S.W.L?
Lift Management Plans
-
Lift Management Plan up to date & captures all lifting activities?<br>(Must be signed off by an Appointed Person.)
-
Competent persons onsite to oversee the lift?
-
All persons involved in the operation are suitably trained?
-
Are Lifting Equipment areas, bases, and grounds subtitle for lifting operations?
-
Does the Emergency Response Plans cover failure of Lifting Operations?
Temporary Works
-
Have Temporary Work Appointments been made in writing?
-
All Temporary Work recorded on the Temporary Works Register?
-
Are all Temporary Works inspected as per requirements?
-
For Temporary Works which require drawings and calculations, are they available onsite?
Hot Works
-
Permit to work system in place and being adhered to?
-
Staff on site suitably train to undertake Hot Works? (Burning Operatives require Medicals.)
-
Are staff using RPE suitably face fitted?
-
Gas bottle storage suitable?<br>(i.e. Lockable cage, Signed, Away from ignition sources & site boundary.)
-
Burning Plant & hoses in suitable condition?
-
Bottles secured on trolley when in use?
-
Operatives wearing suitable PPE? (i.e. Flame-retardant Overalls, Gauntlets, Tinted Visor.)
-
Area suitably ventilated & free from combustile materials?
Utilities & Isolations
-
Isolation certificates available on site for all 'dead' utilities? (i.e. Electric, Gas, Data, Water, M&E.)
-
All services suitable marked onsite?
-
Do Emergency Response Plans cover Service Disturbance?
Portable Tools and Equipment
-
Are all Portable Tools & Equipment inspected weekly under PUWER?
-
All powered tools, leads, etc, have a valid PAT certificate?
-
Tools and Equipment free from defect?
-
Tools and Equipment stored correctly?
-
All Tools & Equipment fitted with appropriate guards?
-
HAV Assessment completed and exposure being recorded?
-
All leads suitably managed to prevent hazards?
Hoarding, Fencing & Security
-
Site Boundary prevents unauthorised site access?
-
Is site suitably secured to prevent trespass out of hours?
-
Hoarding & Fencing in good order (i.e. no damage, protruding nails etc)?
-
Hoarding & Fencing inspected weekly as per temporary works requirements?
-
Are Security personnel briefed on site Emergency Response Plan for Security Breach?
-
Are there arrangements to lock required relevant Plant, Equipment, & Substances, & store all Keys suitably?
Traffic Routes
-
Vehicle routes are clearly designated and signed?
-
Vehicle entrance into site is controlled?
-
Suitable locations defined for loading and unloading?
-
Site speed limit established and adhered to?
-
Vehicle routes are suitable?
-
Site car parking adequately controlled?
-
Are trained Traffic Marshals on site to assist with vehicle movements?
Pedestrian Access and Egress
-
Pedestrian entrance into site controlled?
-
Pedestrian access routes established across site?
-
All access routes have suitable surface with any remaining hazards highlighted?
-
Access routes kept free from obstructions?
PPE
-
Site PPE rules established and displayed?
-
PPE rules being adhered to onsite?
-
Spare PPE available onsite?
Environmental
-
Is the Site Waste Management Plan up to date so far as reasonably practicable? (i.e. 3 monthly)
-
Are Waste Carriers Licences available for all waste carriers being used?
-
Are the Specific Environmental Aspects available on site?
-
Are Designated areas for Waste Storage controlled?
-
Suitable storage for Hazardous Waste items?
-
Waste Transfer Notes & HWTN being completed correctly?
-
Where required, is a section 61 available on site?
-
Where required, are all Permits & Consents to Discharge on site?
-
Is bunding available for all Fuels & Substances?
-
Drips trays present to fixed plant and at refuelling areas?
-
Spill kits present with Trained Personnel onsite?
-
Spill Drills being carried out within reasonable time frames?
Public Interface & Monitoring
-
Is Environmental Monitoring being undertaken? (i.e. Dust, Noise, Vibration, Odour.)
-
Are any excessive monitoring reading identified on site from activities?
-
Any complaints from neighbours logged within the complaints register & reported?
-
Evidence of debris outside of site boundary?
-
Contact Information displayed on the site Hoarding for the public?
Health hazards
-
Are all potential contaminates on site Identified?<br>(i.e. Bird Guano, Legionella, Sharps, Leptospirosis, Carbon Monoxide, Blue Billy.)
-
Is Dust / Odour suppression utilised where required?
-
Are suitable decontamination facilities available?<br>(i.e. Decon Unit, Boot Wash, etc.)
Positives
-
Positive Observation
-
Positive Noted:
Audit Receipt:
-
Audit issued to (name):