Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Voltage
-
Source Voltage
-
Secondary Voltage
-
Hertz
-
Phase
-
Amps
TDS
-
Permeate TDS
-
Rejection Percentage (P-F/F = % x 100 = Rejection)
Pressure
Flows
-
Feed Flow
-
Permeate Flow (Temperature Corrected to 77 F)
-
Temperature Correction Factor #
-
Concentrate Flow
-
Recycle Flow
-
Recovery Percentage ( P / F = % x 100 = Recovery)
Pass / Fail
-
Did Low Pressure Switch Work?
-
Did High Pressure Switch?
-
Did Unit Have Leaks? If Yes, Explain On Next Column
-
Location Of Leaks And Why It Leaked. If None Leave Blank
-
Did Unit Produce Correct Amount Of Product? If No, Explain On Next Column.
-
Explain Low Production. If Not Applicable Leave Blank
-
Comment If Applicable
-
Quality Control Person
-
QC SIGNATURE
-
Date and Time