Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Voltage

  • Source Voltage

  • Secondary Voltage

  • Hertz

  • Phase

  • Amps

TDS

  • Feed TDS

  • Permeate TDS

  • Feed Temperature F

  • Rejection Percentage (P-F/F = % x 100 = Rejection)

Pressure

  • Feed Pressure

  • Pump Pressure: NF(70psi) HF4(100psi) HF1(150psi) HR3(225psi)

  • Concentrate Pressure

Flows

  • Feed Flow

  • Permeate Flow (Temperature Corrected to 77 F)

  • Temperature Correction Factor #

  • Concentrate Flow

  • Recycle Flow

  • Recovery Percentage ( P / F = % x 100 = Recovery)

Pass / Fail

  • Did Low Pressure Switch Work?

  • Did High Pressure Switch?

  • Did Unit Have Leaks? If Yes, Explain On Next Column

  • Location Of Leaks And Why It Leaked. If None Leave Blank

  • Did Unit Produce Correct Amount Of Product? If No, Explain On Next Column.

  • Explain Low Production. If Not Applicable Leave Blank

  • Comment If Applicable

  • Quality Control Person

  • QC SIGNATURE

  • Date and Time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.