Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Safe Work Procedure - Plant / Equipment
-
SWP - Skid steer loader
-
SWP - Street sweeper
-
SWP - Backhoe or Loader
-
SWP - Drive and Manoeuvre Trailers
-
SOP - Vibrating Plate Compactor (Wacker Packer)
-
SWP - concrete saw (quick cut)
Safe Work Procedure - Works
-
SWP - Bituminous surfacing repairs - repairing roads in the LGA using bitumen (hot mix)
-
SWP - Working near overhead power lines and underground services.
-
SWP - Setting up mobile traffic lights. - the setting up and removing of mobile traffic lights at worksites.
-
SWP - Traffic control, set up, maintenance and removal
-
SWP - Picking up sharps
-
SWP - pick up dead animals
-
SWP - working alone
Hazard / Condition
-
Site access / agrees poor
-
Signs / lamp posts
-
Scaffold secure
-
Overhead power lines
-
Other electrical hazards
-
Underground services
-
Exposed Reo
-
Environment (ie noise, dust, fumes)
-
Others working above / below
-
Falling objects possible.
-
Warning notices required.
-
No go zones in area.
-
Exclusion zone not set up
-
Pits / trenches
-
Ground and support conditions poor.
-
Not consulted with other work groups in area.
-
Demolition work nearby.
-
Working on / in / near water
-
Inadequate traffic / pedestrian control
Personal Protective Equipment
-
Breathing
-
Eye protection
-
Hearing protection
-
Gloves
-
High vis
-
Hard hat
-
Harness
-
Long long
-
Face shield
-
Protective boots
-
Sun hat