Pre-Work
-
Take 5 Completed
-
Water Meter ID
-
Conducted on
-
Prepared by
-
Location of meter (quarry)
Flowmeter
-
Inspect the flowmeter and associated pipework for leaks/damage.
-
Clean the flowmeter and Solar panel using a dry or slightly damp cloth and ensure sun protector is in good condition. For the Solar Panel please clean with water and broom
-
Framework: Visually inspect skid structure for corrosion or damage toframework or fixings
-
Connections and Cabling: Visually inspect electrical cabling between control panel<br>and solar array:<br>a. Inspect all cabling for discolouration, signs of heating, cuts, abrasion, rubbing.<br>b. Check electrical cables are secure.
Battery Enclosure
-
Clean and check the battery enclosure
-
Connections: Visually inspect electrical cabling between control panel and battery enclosure
-
Labels: Inspect condition of all battery enclosure component labelling.
Sign Off
-
Name
-
Actions or Defects