Pre-Work

  • Take 5 Completed

  • Water Meter ID

  • Conducted on

  • Prepared by

  • Location of meter (quarry)

Flowmeter

  • Inspect the flowmeter and associated pipework for leaks/damage.

  • Clean the flowmeter and Solar panel using a dry or slightly damp cloth and ensure sun protector is in good condition. For the Solar Panel please clean with water and broom

  • Framework: Visually inspect skid structure for corrosion or damage toframework or fixings

  • Connections and Cabling: Visually inspect electrical cabling between control panel<br>and solar array:<br>a. Inspect all cabling for discolouration, signs of heating, cuts, abrasion, rubbing.<br>b. Check electrical cables are secure.

Battery Enclosure

  • Clean and check the battery enclosure

  • Connections: Visually inspect electrical cabling between control panel and battery enclosure

  • Labels: Inspect condition of all battery enclosure component labelling.

Sign Off

  • Name

  • Actions or Defects

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.