Title Page
-
Job Number
-
Audit Title
-
Client / Site
-
Add location
-
Conducted on
-
Prepared by
Tank Survey
-
Is the condition of the tank and associated pipe work acceptable
-
Tank number/Details/Priority/Action by whom and date
-
Add media
-
Is there any signs of leaks on the water tank, pipe work and valves
-
Tank number/Details/Priority/Action by whom and date
-
Add media
-
Is there signs of condensation
-
Tank number/Details/Priority/Action by whom and date
-
Add media
-
Is there displacement or damage to the covers
-
Tank number/Details/Priority/Action by whom and date
-
Add media
-
Is there vermin screens fitted and in good condition
-
Tank number/Details/Priority/Action by whom and date
-
Add media
-
Is there signs of vermin ingress in the tank room
-
Location of tank room and details
-
Add media
-
Is there any internal damage
-
Tank number/Details/Priority/Action by whom and date
-
Add media
-
Is there signs of corrosion
-
Tank number/Details/Priority/Action by whom and date
-
Add media
-
Level of sediment in the tank
-
Percentage of sediment in the tank
-
Add media
-
Is there any foreign body's in the tank
-
Tank number/Details/Priority/Action by whom and date
-
Add media
-
Is there any biological fouling
-
Tank number/Details/Priority/Action by whom and date
-
Add media
Tank temperature regime
-
Is the stored water below 20oC
-
Tank number/Details/Priority/Action by whom and date
-
Is the supply water below 20oC
-
Tank number/Details/Priority/Action by whom and date
-
Comments and Recommendations
-
Engineers Signature