Title Page
-
Site conducted
-
Date and Time
-
Task
-
Work location
-
Conducted on
-
Prepared by
Material Loading/Unloading & Storage
-
1. Will the load remain stable during transport?
-
2. When a load restraint is removed, will the load remain stable?
-
3. Are potential drop zones controlled to prevent unauthorized access by<br>pedestrians, truck drivers, etc?
-
4. Are team members outside the line of fire if the load moves? i.e. load will<br>not hit or fall on them
-
5. Is the equipment used to move material rated, safe for use and<br>appropriate for the task?
-
6. Are all stacked materials stable and on a level surface?
-
7. Are all stacked materials within height and load limits?
-
8. Is all shelving and racking safe for use? i.e. inspected and free from<br>damage
-
9. Are all securing and support devices (plastic wrap, strapping, pallets)<br>appropriate and safe for use?
Mechanical Integrity of Equipment at Heights
-
10. Have equipment and fixtures (e.g. light fixtures, cable trays etc) in the<br>work area with the potential to fall been inspected and secured?
-
11. Is equipment installed at height in a safe location? i.e. protected from<br>impact by equipment such as cranes or other work activities
Securing Devices
-
12. Are securing devices adequate and safe for use? E.g. tie down straps,<br>lanyards, drop sheets/mats, kick rails
-
13. Are all tools and equipment (including parts) secured to ensure they are<br>unable to fall?
Work Area Management
-
14. Is the work area controlled to prevent all unauthorised access to the<br>potential drop zone of falling objects/materials at all levels? E.g. barricading,<br>segregation, spotter
-
15. Have all other work activities in the area been checked to ensure they<br>are protected from falling objects? E.g. above, below, beside<br>
-
16. Is the work area, including above and below, free from loose materials?<br>E.g. product build-up/carry back
Untitled Page