Information

  • NC Number

  • Street number / Lot number

  • Street Name

  • Suburb

  • Scope of Work performed?

  • Works Conducted on

  • Prepared by

  • Works Performed By? Provide Panel Member Company Name

  • PID

  • Title Reference number

Pre-Works Photos

  • Photos of property prior to works being performed

Safety

Safety

  • Traffic Management /control needed?

  • Upload a photo of the Traffic Guidance Scheme (TGS)

  • Photo/s showing traffic management in place

  • Who was your traffic management designer?

  • Why was no traffic control/management need?

  • SWMS completed?

  • Any Hazards Identified?

  • What are the hazards?

Works Performed - Details & Photos

Works performed summary

  • Any WATER works performed?

  • Was a new fire plug installed?

  • Fire Plug Install photos - repeat this section for every new Fire Plug installed
  • Fire Plug photos

  • Photos showing the excavation works

  • Photos showing the installation of a new fire plug

  • Photos showing the backfill of excavation works

  • Photos showing reinstatement

  • Photos showing fire plug road markings

  • Fire Plug location details

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The measurements from the nearest public road

  • The length (in metres) of the connecting pipework from the mains connection point to the fire plug

  • The depth (in millimetres) of the pipe work at the connection point and termination of the fire plug

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Has a flow test been completed?

  • If you don't have flow testing equipment, please contact TasWater on 13 6992 to arrange a flow test and send a copy of the flow test results with the completion sheet pack.

  • Please upload load a copy of the flow test results.

  • Was a fire hydrant installed?

  • Fire Hydrant Install photos - repeat this section for every new Fire Hydrant installed
  • Fire Hydrant photos

  • Photos showing the excavation works

  • Photos showing the installation of a new hydrant

  • Photos showing the backfill of excavation works

  • Photos showing reinstatement

  • Photos showing hydrant road markings

  • Fire Hydrant location details

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The measurements from the nearest public road

  • The length (in metres) of the connecting pipework from the mains connection point to the hydrant

  • The depth (in millimetres) of the pipe work at the connection point and termination of the hydrant

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Has a flow test been completed?

  • If you don't have flow testing equipment, please contact TasWater on 13 6992 to arrange a flow test and send a copy of the flow test results with the completion sheet pack.

  • Please upload load a copy of the flow test results.

  • Was a Brand NEW water connection installed? (e.g. was a new TPFNR installed?)

  • Was a Fire Service installed

  • Fire Service Details - repeat this section for every Fire Service installed (for CIB)
  • Fire Service details (for CIB)

  • What size is the new Fire Service Connection size?

  • What size is the Bypass Meter size?

  • Bypass meter serial number

  • Clear close-up photo showing the Bypass meter serial number & meter reading

  • Bypass meter radio number

  • Clear close-up photo showing the Bypass meter radio number

  • How was the Fire service installed?

  • Photos showing Fire service assembly

  • Date the Fire service was installed

  • Serviced Property (e.g. unit 1 or Lot 1) - Fire Service

  • Description of land at time of Connection - Fire Service

  • Fire Connection/Water works photos & location details - Repeat this section for every new water connection performed
  • Water Works & Reinstatement Photos

  • Photo showing the water connection point on TasWater infrastructure (i.e. Pipe Tees (including any isolation valve)

  • Photos showing the installation of the new connection property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Was a domestic meter assembly installed with the fire service?

  • Domestic Meter Details - repeat this section for every Domestic assembly installed with a Fire Service (for CIB)
  • Domestic Meter Details (for CIB)

  • What size is the Domestic meter?

  • What size is the New Water Connection?

  • Domestic meter serial number

  • Clear close-up photo showing the Domestic meter serial number & meter reading

  • Domestic meter radio number

  • Clear close-up photo showing the Domestic meter radio number

  • How was the Domestic Meter situated?

  • Photos showing Domestic meter assembly

  • Date of Domestic meter install

  • Serviced Property (e.g. unit 1 or Lot 1) - Domestic

  • Description of land at time of Connection - Domestic

  • Is meter installation Complete?

  • Was a manifold installed?

  • How many meters were installed on a manifold?

  • Photo showing manifold construction prior to backfilling

  • Meter Details - repeat this section for every METER installed on a manifold (for CIB)
  • Water Connection & Meter details (for CIB)

  • What ID size is the new water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photo showing meter installed in boundary box

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Water works photos & location details - Repeat this section for every New Water Connection performed
  • Water Works & Reinstatement Photos

  • Photo showing the water connection point on TasWater infrastructure (i.e. Pipe Tees (including any isolation valve)

  • Photos showing the installation of the new property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Meter Details (for CIB) - repeat this section for every new METER installed on a new water connection
  • Water Connection & Meter details (for CIB)

  • What ID size is the new water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photo showing meter installed in boundary box

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Water works photos & location details - Repeat this section for every New Water Connection performed
  • Water Works & Reinstatement Photos

  • Photo showing the water connection point on TasWater infrastructure (i.e. Pipe Tees (including any isolation valve)

  • Photos showing the installation of the new property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • Was the existing water connection upgraded?

  • Was the existing water connection downsized?

  • Was a Fire Service installed

  • Fire Service Details - repeat this section for every Fire Service installed (for CIB)
  • Fire Service Details (for CIB)

  • What size is the new Fire Service Connection size?

  • What size is the Bypass Meter size?

  • Bypass meter serial number

  • Clear close-up photo showing the Bypass meter serial number & meter reading

  • Bypass meter radio number

  • Clear close-up photo showing the Bypass meter radio number

  • How was the Fire service installed?

  • Photo showing Fire Service meter assembly

  • Date the Fire service was installed

  • Serviced Property (e.g. unit 1 or Lot 1) - Fire Service

  • Description of land at time of Connection - Fire Service

  • Was a domestic meter assembly installed with the fire service?

  • Domestic Meter Details - repeat this section for every Domestic assembly installed with a Fire Service (for CIB)
  • Domestic Meter Details (for CIB)

  • What size is the Domestic meter?

  • What size is the New Water Connection?

  • Domestic meter serial number

  • Clear close-up photo showing the Domestic meter serial number & meter reading

  • Domestic meter radio number

  • Clear close-up photo showing the Domestic meter radio number

  • How was the Domestic Meter situated?

  • Is meter installation Complete?

  • Photo showing the Domestic Meter assembly

  • Date of Domestic meter install

  • Serviced Property (e.g. unit 1 or Lot 1) - Domestic

  • Description of land at time of Connection - Domestic

  • Water works photos & location details - Repeat this section for every water Downsize performed
  • Water Works & Reinstatement Photos

  • Photo showing the water connection point on TasWater infrastructure (i.e. Pipe Tees (including any isolation valve)

  • Photos showing the installation of the downsize property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • Was a manifold installed?

  • How many meters were installed on a manifold?

  • Photo showing manifold construction prior to backfilling

  • Meter Details - repeat this section for every METER installed on a manifold (for CIB)
  • Water Connection & Meter details (for CIB)

  • What ID size was the existing connection downsized to?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photo showing meter installed in boundary box

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Water works photos & location details - Repeat this section for every downsized water connection performed
  • Water Works & Reinstatement Photos

  • Photos showing the installation of the downsized property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • Meter Details - repeat this section for every METER installed on a downsized connection (for CIB)
  • Water Connection & Meter details (for CIB)

  • What ID size was the existing water connection downsized to?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photo showing meter installed in boundary box

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Water works photos & location details - Repeat this section for every downsized water connection performed
  • Water Works & Reinstatement Photos

  • Photos showing the installation of the downsized property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • Was a Fire Service installed on existing connection?

  • Fire Service Details - repeat this section for every Fire Service installed
  • Fire Service Details (for RA Revenue Assurance)

  • What size is the Fire Service size?

  • What size is the Bypass Meter size?

  • Bypass meter serial number

  • Clear close-up photo showing the Bypass meter serial number & meter reading

  • Bypass meter radio number

  • Clear close-up photo showing the Bypass meter radio number

  • How was the Fire service installed?

  • Photos showing Fire service assembly

  • Serviced Property (e.g. unit 1 or Lot 1) - Fire Service

  • Date the Fire service was installed

  • Description of land at time of Connection - Fire Service

  • Water works photos & location details - Repeat this section for every water upgrade performed
  • Water Works & Reinstatement Photos

  • Photo showing TasWater Mains

  • Photo showing the water connection point on TasWater infrastructure (i.e. Pipe Tees (including any isolation valve)

  • Photos showing the installation of the upgraded property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • Was a domestic meter assembly installed with the fire service?

  • Domestic Meter Details - repeat this section for every Domestic assembly installed with a Fire Service
  • Domestic Meter Details

  • What size is the existing Water Connection?

  • What size is the Domestic meter?

  • Domestic meter serial number

  • Clear close-up photo showing the Domestic meter serial number & meter reading

  • Domestic meter radio number

  • Clear close-up photo showing the Domestic meter radio number

  • How was the Domestic Meter situated?

  • Is meter installation Complete?

  • Photos showing domestic meter assembly

  • Date of Domestic meter install

  • Serviced Property (e.g. unit 1 or Lot 1) - Domestic

  • Description of land at time of Connection - Domestic

  • Was a manifold installed on an existing water connection?

  • How many meters were installed on a manifold?

  • Photo showing manifold construction prior to backfilling

  • Meter Details - repeat this section for every METER installed on a manifold (for CIB)
  • Water Connection & Meter details (CIB)

  • What size is the new water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photo showing meter installed in boundary box

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Meter install works photos & location details - Repeat this section for every manifold installed on an existing water connection
  • Water Works & Reinstatement Photos

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • Was an existing water connection / meter relocated?

  • Was the existing meter re-used?

  • Existing Water Connection & Meter details (for CIB)

  • What size is the existing water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photos showing completed meter installation

  • Photo showing meter boundary box was installed

  • Photo showing the meter is self draining in meter

  • Photos showing completed meter installation

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Was the existing meter removed & replaced with a new meter? (for CIB)

  • What was the removed meter size? (for CIB)

  • Meter Serial number

  • Clear close-up photo showing the removed meter serial number & meter reading

  • Clear close-up photo showing the removed meter radio number

  • Date of meter removal

  • Description of property at time of disconnection

  • Serviced Property (e.g. unit 1 or Lot 1)

  • Was a manifold installed on the relocated water connection?

  • How many meters were installed on a manifold?

  • Photo showing manifold construction prior to backfilling

  • Meter Details - repeat this section for every METER installed on a manifold (for CIB)
  • Existing Water Connection & Meter details (for CIB)

  • What size is the existing water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photos showing completed meter installation

  • Photo showing meter boundary box was installed

  • Photo showing the meter is self draining in meter

  • Photos showing completed meter installation

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Water works photos & location details - Repeat this section for every relocation performed
  • Water Works & Reinstatement Photos

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • Meter details - repeat this section for every METER installed on existing water connection (for CIB)
  • What size is the existing water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photos showing completed meter installation

  • Photo showing meter boundary box was installed

  • Photo showing the meter is self draining in meter

  • Photos showing completed meter installation

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Water Works & Reinstatement Photos

  • Photos showing excavation works

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • Meter Details (for CIB) - repeat this section for every new Meter installed on an existing connection
  • Water Connection & Meter details (for CIB)

  • What ID size is the existing water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photo showing meter installed in boundary box

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Meter install works photos & location details - Repeat this section
  • Water Works & Reinstatement Photos

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • Was a Fire Service installed

  • Fire Service Details - repeat this section for every Fire Service installed (for CIB)
  • Fire Service Details (for CIB)

  • What size is the Fire Service Connection size?

  • What size is the Bypass Meter size?

  • Bypass meter serial number

  • Clear close-up photo showing the Bypass meter serial number & meter reading

  • Bypass meter radio number

  • Clear close-up photo showing the Bypass meter radio number

  • How was the Fire service installed?

  • Photo showing Fire Service meter assembly

  • Date the Fire service was installed

  • Serviced Property (e.g. unit 1 or Lot 1) - Fire Service

  • Description of land at time of Connection - Fire Service

  • Water works photos & location details - Repeat this section for every water upgrade performed
  • Water Works & Reinstatement Photos

  • Photo showing the water connection point on TasWater infrastructure (i.e. Pipe Tees (including any isolation valve)

  • Photos showing the installation of the upgrade property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • Was a domestic meter assembly installed with the fire service?

  • Domestic Meter Details - repeat this section for every Domestic assembly installed with a Fire Service (for CIB)
  • Domestic Meter Details (for CIB)

  • What size is the Domestic meter?

  • What size is the New Water Connection?

  • Domestic meter serial number

  • Clear close-up photo showing the Domestic meter serial number & meter reading

  • Domestic meter radio number

  • Clear close-up photo showing the Domestic meter radio number

  • How was the Domestic Meter situated?

  • Is meter installation Complete?

  • Photo showing the Domestic Meter assembly

  • Date of Domestic meter install

  • Serviced Property (e.g. unit 1 or Lot 1) - Domestic

  • Description of land at time of Connection - Domestic

  • Was a manifold installed on an existing water connection?

  • How many meters were installed on a manifold?

  • Photo showing manifold construction prior to backfilling

  • Was the existing meter re-used on the manifold?

  • Existing Water Connection & Meter details (for CIB)

  • What size is the existing water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photos showing completed meter installation

  • Photo showing meter boundary box was installed

  • Photo showing the meter is self draining in meter

  • Photos showing completed meter installation

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Was the existing meter removed? (for CIB)

  • What was the removed meter size? (for CIB)

  • Meter Serial number

  • Clear close-up photo showing the removed meter serial number & meter reading

  • Clear close-up photo showing the removed meter radio number

  • Date of meter removal

  • Description of property at time of disconnection

  • Serviced Property (e.g. unit 1 or Lot 1)

  • Meter Details - repeat this section for every METER installed on a manifold (for CIB)
  • Existing Water Connection & Meter details (for CIB)

  • What ID size was the existing water connection upgraded to?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photos showing completed meter installation

  • Photo showing meter boundary box was installed

  • Photo showing the meter is self draining in meter

  • Photos showing completed meter installation

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Upgraded Water Connection & Meter details (for CIB)
  • Meter Details (for CIB)

  • What ID size was the existing water connection upgraded to?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photos showing completed meter installation

  • Photo showing meter boundary box was installed

  • Photo showing the meter is self draining in meter

  • Photos showing completed meter installation

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Upgraded water works photos & location details - Repeat this section for every water upgrade performed
  • Water Works & Reinstatement Photos

  • Photo showing TasWater Mains

  • Photos showing the installation of the upgraded property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • Was a brand NEW water connection installed? (e.g. was a new TPFNR installed?)

  • Was a Fire Service installed

  • Fire Service Details - repeat this section for every Fire Service installed (for CIB)
  • What size is the new Fire Service Connection size?

  • What size is the Bypass Meter size?

  • Bypass meter serial number

  • Clear close-up photo showing the Bypass meter serial number & meter reading

  • Bypass meter radio number

  • Clear close-up photo showing the Bypass meter radio number

  • How was the Fire service installed?

  • Photos showing Fire service assembly

  • Date the Fire service was installed

  • Serviced Property (e.g. unit 1 or Lot 1) - Fire Service

  • Description of land at time of Connection - Fire Service

  • Fire Connection/Water works photos & location details - Repeat this section for every new water connection performed
  • Water Works & Reinstatement Photos

  • Photo showing the water connection point on TasWater infrastructure (i.e. Pipe Tees (including any isolation valve)

  • Photos showing the installation of the new connection property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Was a domestic meter assembly installed with the fire service?

  • Domestic Meter Details - repeat this section for every Domestic assembly installed with a Fire Service (for CIB)
  • Domestic Meter Details

  • What size is the Domestic meter?

  • What size is the New Water Connection?

  • Domestic meter serial number

  • Clear close-up photo showing the Domestic meter serial number & meter reading

  • Domestic meter radio number

  • Clear close-up photo showing the Domestic meter radio number

  • How was the Domestic Meter situated?

  • Photos showing Domestic meter assembly

  • Date of Domestic meter install

  • Serviced Property (e.g. unit 1 or Lot 1) - Domestic

  • Description of land at time of Connection - Domestic

  • Is meter installation Complete?

  • Was a manifold installed?

  • How many meters were installed on a manifold?

  • Photo showing manifold construction prior to backfilling

  • Was the existing meter re-used on the manifold?

  • Existing Water Connection & Meter details (for CIB)

  • What size is the existing water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photos showing completed meter installation

  • Photo showing meter boundary box was installed

  • Photo showing the meter is self draining in meter

  • Photos showing completed meter installation

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Was the existing meter removed? (for CIB)

  • What was the removed meter size? (for CIB)

  • Meter Serial number

  • Clear close-up photo showing the removed meter serial number & meter reading

  • Clear close-up photo showing the removed meter radio number

  • Date of meter removal

  • Description of property at time of disconnection

  • Serviced Property (e.g. unit 1 or Lot 1)

  • Meter Details - repeat this section for every NEW METER installed on a manifold (for CIB)
  • Water Connection & Meter details (CIB)

  • What size is the new water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photo showing meter installed in boundary box

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Water works photos & location details - Repeat this section for every new Water Connection performed
  • Water Works & Reinstatement Photos

  • Photo showing the water connection point on TasWater infrastructure (i.e. Pipe Tees (including any isolation valve)

  • Photos showing the installation of the new property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • What is the water main material type?

  • Meter Details (for CIB) - repeat this section for every new meter installed on a new connection performed
  • Water Connection & Meter details (for CIB)

  • What size is the new water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photo showing meter installed in boundary box

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Water works photos & location details - Repeat this section for every new Water Connection performed
  • Water Works & Reinstatement Photos

  • Photo showing the water connection point on TasWater infrastructure (i.e. Pipe Tees (including any isolation valve)

  • Photos showing the installation of the new property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • What is the water main material type?

  • Was the existing water connection upgraded?

  • Was the existing water connection downsized?

  • Was a Fire Service installed

  • Fire Service Details - repeat this section for every Fire Service installed (for CIB)
  • Fire Service Details (for CIB)

  • What size is the new Fire Service Connection size?

  • What size is the Bypass Meter size?

  • Bypass meter serial number

  • Clear close-up photo showing the Bypass meter serial number & meter reading

  • Bypass meter radio number

  • Clear close-up photo showing the Bypass meter radio number

  • How was the Fire service installed?

  • Photo showing Fire Service meter assembly

  • Date the Fire service was installed

  • Serviced Property (e.g. unit 1 or Lot 1) - Fire Service

  • Description of land at time of Connection - Fire Service

  • Was a domestic meter assembly installed with the fire service?

  • Domestic Meter Details - repeat this section for every Domestic assembly installed with a Fire Service (for CIB)
  • Domestic Meter Details (for CIB)

  • What size is the Domestic meter?

  • What size is the New Water Connection?

  • Domestic meter serial number

  • Clear close-up photo showing the Domestic meter serial number & meter reading

  • Domestic meter radio number

  • Clear close-up photo showing the Domestic meter radio number

  • How was the Domestic Meter situated?

  • Is meter installation Complete?

  • Photo showing the Domestic Meter assembly

  • Date of Domestic meter install

  • Serviced Property (e.g. unit 1 or Lot 1) - Domestic

  • Description of land at time of Connection - Domestic

  • Water works photos & location details - Repeat this section for every water Downsize performed
  • Water Works & Reinstatement Photos

  • Photo showing the water connection point on TasWater infrastructure (i.e. Pipe Tees (including any isolation valve)

  • Photos showing the installation of the downsize property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Was a manifold installed?

  • How many meters were installed on a manifold?

  • Photo showing manifold construction prior to backfilling

  • Meter Details - repeat this section for every METER installed on a manifold (for CIB)
  • Water Connection & Meter details (for CIB)

  • What size is the new water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photo showing meter installed in boundary box

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Water works photos & location details - Repeat this section for every Downsized Water Connection performed
  • Water Works & Reinstatement Photos

  • Photos showing the installation of the downsized property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Meter Details - repeat this section for every METER installed on
    a downsized connection (for CIB)
  • Water Connection & Meter details (for CIB)

  • What size was the existing water connection downsized to?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photo showing meter installed in boundary box

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Water works photos & location details - Repeat this section for every Downsized Water Connection performed
  • Water Works & Reinstatement Photos

  • Photos showing the installation of the downsized property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Was a Fire Service installed on existing connection?

  • Fire Service Details - repeat this section for every Fire Service installed (for CIB)
  • Fire Service Details (for CIB)

  • What size is the Fire Service size?

  • What size is the Bypass Meter size?

  • Bypass meter serial number

  • Clear close-up photo showing the Bypass meter serial number & meter reading

  • Bypass meter radio number

  • Clear close-up photo showing the Bypass meter radio number

  • How was the Fire service installed?

  • Photos showing Fire service assembly

  • Serviced Property (e.g. unit 1 or Lot 1) - Fire Service

  • Date the Fire service was installed

  • Description of land at time of Connection - Fire Service

  • Water Works & Reinstatement Photos

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • Was a domestic meter assembly installed with the fire service?

  • Domestic Meter Details - repeat this section for every Domestic assembly installed with a Fire Service (for CIB)
  • Domestic Meter Details (for CIB)

  • What size is the existing Water Connection?

  • What size is the Domestic meter?

  • Domestic meter serial number

  • Clear close-up photo showing the Domestic meter serial number & meter reading

  • Domestic meter radio number

  • Clear close-up photo showing the Domestic meter radio number

  • How was the Domestic Meter situated?

  • Is meter installation Complete?

  • Photos showing domestic meter assembly

  • Date of Domestic meter install

  • Serviced Property (e.g. unit 1 or Lot 1) - Domestic

  • Description of land at time of Connection - Domestic

  • Water Works & Reinstatement Photos

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Was a meter installed on existing water connection?

  • Was a manifold installed on an existing water connection?

  • How many meters were installed on a manifold?

  • Photo showing manifold construction prior to backfilling

  • Was the existing meter re-used on the manifold?

  • Existing Water Connection & Meter details (for CIB)

  • What size is the existing water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photos showing completed meter installation

  • Photo showing meter boundary box was installed

  • Photo showing the meter is self draining in meter

  • Photos showing completed meter installation

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Was the existing meter removed? (for CIB)

  • What was the removed meter size? (for CIB)

  • Meter Serial number

  • Clear close-up photo showing the removed meter serial number & meter reading

  • Clear close-up photo showing the removed meter radio number

  • Date of meter removal

  • Description of property at time of disconnection

  • Serviced Property (e.g. unit 1 or Lot 1)

  • Meter Details - repeat this section for every METER installed on a manifold (for CIB)
  • Existing Water Connection & Meter details (for CIB)

  • What size is the existing water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photos showing completed meter installation

  • Photo showing meter boundary box was installed

  • Photo showing the meter is self draining in meter

  • Photos showing completed meter installation

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Water works photos & location details - Repeat this section for every Manifold installed
  • Water Works & Reinstatement Photos

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Meter details - repeat this section for every METER installed on existing water connection (for CIB)
  • What size is the existing water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photos showing completed meter installation

  • Photo showing meter boundary box was installed

  • Photo showing the meter is self draining in meter

  • Photos showing completed meter installation

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Water Works & Reinstatement Photos

  • Photos showing excavation works

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Was an existing water connection / meter relocated?

  • Was the existing meter re-used?

  • Existing Water Connection & Meter details (for CIB)

  • What size is the existing water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photos showing completed meter installation

  • Photo showing meter boundary box was installed

  • Photo showing the meter is self draining in meter

  • Photos showing completed meter installation

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Was the existing meter REMOVED & REPLACED with a NEW water meter? (for CIB)

  • What was the removed meter size? (for CIB)

  • Meter Serial number

  • Clear close-up photo showing the removed meter serial number & meter reading

  • Clear close-up photo showing the removed meter radio number

  • Date of meter removal

  • Description of property at time of disconnection

  • Serviced Property (e.g. unit 1 or Lot 1)

  • Was a manifold installed on the relocated water connection?

  • How many meters were installed on a manifold?

  • Photo showing manifold construction prior to backfilling

  • Meter Details - repeat this section for every METER installed on a manifold (for CIB)
  • Existing Water Connection & Meter details (for CIB)

  • What size is the existing water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photos showing completed meter installation

  • Photo showing meter boundary box was installed

  • Photo showing the meter is self draining in meter

  • Photos showing completed meter installation

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Water works photos & location details - Repeat this section for every relocation performed
  • Water Works & Reinstatement Photos

  • Photos showing excavation works

  • Photos showing the installation of pipe work

  • Photos showing backfill

  • Photos showing installation of metallic detector tape

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Meter details - repeat this section for every METER installed on existing water connection (for CIB)
  • What size is the existing water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photos showing completed meter installation

  • Photo showing meter boundary box was installed

  • Photo showing the meter is self draining in meter

  • Photos showing completed meter installation

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Water Works & Reinstatement Photos

  • Photos showing excavation works

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Water works photos & location details - Repeat this section for every relocation performed
  • Water Works & Reinstatement Photos

  • Photos showing the excavation works

  • Photos showing backfill

  • Photos showing the installation of pipe work

  • Photos showing the installation of metallic detector tape

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Was a Fire Service installed

  • Fire Service Details - repeat this section for every Fire Service installed (for CIB)
  • Fire Service Details (for CIB)

  • What size is the Fire Service Connection size?

  • What size is the Bypass Meter size?

  • Bypass meter serial number

  • Clear close-up photo showing the Bypass meter serial number & meter reading

  • Bypass meter radio number

  • Clear close-up photo showing the Bypass meter radio number

  • How was the Fire service installed?

  • Photo showing Fire Service meter assembly

  • Date the Fire service was installed

  • Serviced Property (e.g. unit 1 or Lot 1) - Fire Service

  • Description of land at time of Connection - Fire Service

  • Water works photos & location details - Repeat this section for every water upgrade performed
  • Water Works & Reinstatement Photos

  • Photo showing the water connection point on TasWater infrastructure (i.e. Pipe Tees (including any isolation valve)

  • Photos showing the installation of the upgrade property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Was a domestic meter assembly installed with the fire service?

  • Domestic Meter Details - repeat this section for every Domestic assembly installed with a Fire Service (for CIB)
  • Domestic Meter Details (for CIB)

  • What size is the Domestic meter?

  • What size is the New Water Connection?

  • Domestic meter serial number

  • Clear close-up photo showing the Domestic meter serial number & meter reading

  • Domestic meter radio number

  • Clear close-up photo showing the Domestic meter radio number

  • How was the Domestic Meter situated?

  • Is meter installation Complete?

  • Photo showing the Domestic Meter assembly

  • Date of Domestic meter install

  • Serviced Property (e.g. unit 1 or Lot 1) - Domestic

  • Description of land at time of Connection - Domestic

  • Was a manifold installed on an existing water connection? (for CIB)

  • How many meters were installed on a manifold?

  • Photo showing manifold construction prior to backfilling

  • Was the existing meter re-used on the manifold?

  • Existing Water Connection & Meter details (for CIB)

  • What size is the existing water connection?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photos showing completed meter installation

  • Photo showing meter boundary box was installed

  • Photo showing the meter is self draining in meter

  • Photos showing completed meter installation

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Was the existing meter removed? (for CIB)

  • What was the removed meter size? (for CIB)

  • Meter Serial number

  • Clear close-up photo showing the removed meter serial number & meter reading

  • Clear close-up photo showing the removed meter radio number

  • Date of meter removal

  • Description of property at time of disconnection

  • Serviced Property (e.g. unit 1 or Lot 1)

  • Meter Details - repeat this section for every NEW METER installed on a manifold (for CIB)
  • Existing Water Connection & Meter details (for CIB)

  • What size is the existing water connection upgraded to?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photos showing completed meter installation

  • Photo showing meter boundary box was installed

  • Photo showing the meter is self draining in meter

  • Photos showing completed meter installation

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Meter details - repeat this section for every METER installed on an upgraded water connection (for CIB)
  • What size was the existing water connection upgraded to?

  • What is the meter size?

  • Meter Serial number

  • Clear close-up photo showing the meter serial number & meter reading

  • Meter radio number

  • Clear close-up photo showing the meter radio number

  • Date of meter install

  • Meter serviced (e.g. unit 1)

  • Is meter installation Complete?

  • Description of land at time of Connection

  • How was the meter installed?

  • Photos showing completed meter installation

  • Photo showing meter boundary box was installed

  • Photo showing the meter is self draining in meter

  • Photos showing completed meter installation

  • Photo showing trafficable meter box was installed

  • Photo showing the meter is self draining in meter box

  • Photos showing completed meter installation

  • Photos showing completed meter installation

  • Upgraded water works photos & location details - Repeat this section for every Upgraded Water Connection performed
  • Water Works & Reinstatement Photos

  • Photo showing TasWater Mains

  • Photos showing the installation of the upgraded property water connection pipework

  • Photos showing the installation of metallic detector tape

  • Photos showing backfill

  • Photos showing reinstatement of excavations works, including meter assembly

  • Water meter location

  • The measurements from the property boundaries (e.g. 5mtrs from left boundary & 500mm from front boundary)

  • The length (in metres) of the connecting pipework from the mains connection point.

  • The depth (in millimetres) of the pipe work at the connection point.

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Was a disconnection performed?

Disconnection Works - Details & Photos

  • Was an existing WATER connection capped & sealed?

  • Was the pipe work removed?

  • WATER Disconnected Service Photos & Details - repeat this for each Water disconnect (for CIB)
  • WATER Disconnected Service details (for CIB)

  • What size was the existing water connection that was disconnected?

  • What was the removed meter size?

  • Meter Serial number

  • Clear close-up photo showing the removed meter serial number & meter reading

  • Clear close-up photo showing the removed meter radio number

  • Date of meter removal

  • Description of property at time of disconnection

  • Serviced Property (e.g. unit 1 or Lot 1)

  • Water Disconnected Service (Customer Connections & Asset info)

  • Photos showing the existing connection

  • Photos showing excavation works

  • Photo showing the cap and seal of existing water connection

  • Photos showing backfill

  • Photos showing reinstatement of excavation area

  • The measurements from the property boundaries to the disconnection point on TasWater mains.

  • Northerly bearing

  • What is the water main material type?

  • If 'Other' is chosen please provide the material type

  • Was an existing SEWER connection capped & sealed?

  • Sewer Disconnection Photos & Details - repeat this section for every sewer disconnection (for CIB)
  • SEWER Disconnected Service details (for CIB)

  • What size was the existing sewer connection that was disconnected?

  • Date of sewer disconnection

  • Serviced Property (e.g. unit 1 or Lot 1)

  • Description of property at time of works being performed?

  • Sewer Disconnected Service (Customer Connections & Asset info)

  • Photos showing the excavation works

  • Photos showing the existing sewer connection

  • Photo showing the cap and seal of existing connection

  • Photos showing backfill

  • Reinstatement of excavation works

  • The measurements from the property boundaries to the disconnection point on TasWater mains.

  • Northerly bearing

  • Was an existing SEWER connection capped & sealed?

  • Sewer Disconnection Details - repeat this section for every sewer disconnection
  • SEWER Disconnected Service details (for RA Revenue Assurance)

  • What size was the existing sewer connection that was disconnected?

  • Date of sewer disconnection

  • Serviced Property (e.g. unit 1 or Lot 1)

  • Description of property at time of works being performed?

  • Sewer Disconnected Service (Customer Connections & Asset info)

  • Photos showing the excavation works

  • Photos showing the existing sewer connection

  • Photo showing the cap and seal of existing connection

  • Photos showing backfill

  • Reinstatement of excavation works

  • The measurements from the property boundaries to the disconnection point on TasWater mains.

  • Northerly bearing

Disconnection Works

  • Was a disconnection performed?

Disconnection Works - Details & Photos

  • Was an existing WATER connection capped & sealed?

  • Was the pipe work removed?

  • WATER Disconnected Service Photos & Details - repeat this for each Water disconnect (for CIB)
  • WATER Disconnected Service details (for CIB)

  • What size was the existing water connection that was disconnected?

  • What was the removed meter size?

  • Meter Serial number

  • Clear close-up photo showing the removed meter serial number & meter reading

  • Clear close-up photo showing the removed meter radio number

  • Date of meter removal

  • Description of property at time of disconnection

  • Serviced Property (e.g. unit 1 or Lot 1)

  • Water Disconnected Service (Customer Connections & Asset info)

  • Photos showing the existing connection

  • Photos showing excavation works

  • Photo showing the cap and seal of existing water connection

  • Photos showing backfill

  • Photos showing reinstatement of excavation area

  • The measurements from the property boundaries to the disconnection point on TasWater mains.

  • Northerly bearing

  • Was an existing SEWER connection capped & sealed?

  • Sewer Disconnection Photos & Details - repeat this section for every sewer disconnection (for CIB)
  • SEWER Disconnected Service details (for CIB)

  • What size was the existing sewer connection that was disconnected?

  • Date of sewer disconnection

  • Serviced Property (e.g. unit 1 or Lot 1)

  • Description of property at time of works being performed?

  • Sewer Disconnected Service (Customer Connections & Asset info)

  • Photos showing the excavation works

  • Photos showing the existing sewer connection

  • Photo showing the cap and seal of existing connection

  • Photos showing backfill

  • Reinstatement of excavation works

  • The measurements from the property boundaries to the disconnection point on TasWater mains.

  • Northerly bearing

  • Was an existing SEWER connection capped & sealed?

  • Sewer Disconnection Details - repeat this section for every sewer disconnection (for CIB)
  • SEWER Disconnected Service details (for CIB)

  • What size was the existing sewer connection that was disconnected?

  • Date of sewer disconnection

  • Serviced Property (e.g. unit 1 or Lot 1)

  • Description of property at time of works being performed?

  • Sewer Disconnected Service (Customer Connections & Asset info)

  • Photos showing the excavation works

  • Photos showing the existing sewer connection

  • Photo showing the cap and seal of existing connection

  • Photos showing backfill

  • Reinstatement of excavation works

  • The measurements from the property boundaries to the disconnection point on TasWater mains.

  • Northerly bearing

Sewer Works

  • Any SEWER works performed?

  • Was a new sewer connection performed?

  • Was a Pressure Sewer Unit installed?

  • Pressure Sewer Unit installed - Repeat this section for every PSU install (for CIB)
  • Sewer Connection Details (for CIB)

  • What size is the new sewer connection?

  • Date of sewer works were installed

  • Is sewer installation complete?

  • Serviced Property (e.g. unit 1 or Lot 1)

  • Description of property at time of works being performed?

  • Sewer Work Photos (Customer Connections & Asset info)

  • Photos showing the excavation works

  • Photos showing the sewer connection point on TasWater infrastructure.

  • Photos showing the installation of the pipe work

  • Photos showing the install of the boundary kit

  • Photos showing the installation of the PSU tank

  • Photos showing backfill of sewer works

  • Photos showing reinstatement of excavations including the PSU tank, boundary kit and alarm install

  • Photos showing the installation of metallic detector tape

  • Sewer location details

  • The measurements from the property boundaries

  • The length (in metres) of the connecting pipework from the main/manhole connection point to the IO.

  • The depth (in millimetres) of the pipe work at the connection point and termination IO for sewer

  • Northerly bearing

  • Has the PSU been commissoned?

  • Please make arrangements to have the unit commissioned and send in a copy of the PSU commissioning certificate with your completion sheet pack to Connections@taswater.com.au

  • Upload a photo of the PSU commissioning certificate

  • Upload a photo of the electrical commissioning certificate

  • Sewer Connection Details - repeat this section for every new sewer connection installed (for CIB)
  • Sewer Connection Details (for CIB)

  • What size is the new sewer connection?

  • Date of sewer works were installed

  • Is sewer installation complete?

  • Serviced Property (e.g. unit 1 or Lot 1)

  • Description of property at time of works being performed?

  • Sewer Work Photos (Customer Connections & Asset info)

  • Photos showing the excavation works

  • How was the new sewer connected to our infrastructure?

  • Photos showing the inside of manhole prior to new connection being installed

  • Photos showing the inside of the manhole after sewer connection was installed

  • Photos showing the outside of the manhole where the sewer connection has been installed

  • What type of fitting was used to install the sewer connection on our infrastructure? e.g. stainless-steel wang fitting

  • Photos showing the fitting installed on our sewer main

  • How was the sewer connection installed? e.g. via existing stub

  • Photos showing the connection point on our infrastructure

  • Photos showing the installation of the pipe work

  • Photos showing the installation of the IO (Inspection Opening)

  • Photos showing backfill of sewer works

  • Photos showing the installation of metallic detector tape

  • Photos showing reinstatement of excavations including IO (Inspection Opening) install

  • Sewer location details

  • The measurements from the property boundaries

  • The length (in metres) of the connecting pipework from the main/manhole connection point to the IO.

  • The depth (in millimetres) of the pipe work at the connection point and termination IO for sewer

  • Northerly bearing

  • Was a trafficable IO cover installed

  • Photo showing installation of trafficable IO cover

  • Was the existing sewer connection upgraded?

  • Sewer Connection Details - repeat this section for every sewer connection upgrade performed (for CIB)
  • Sewer Connection Upgrade Details (for CIB)

  • What size was the existing sewer connection upgraded to?

  • Date of sewer install

  • Is sewer installation complete?

  • Serviced Property (e.g. unit 1 or Lot 1)

  • Description of property at time of works being performed?

  • Sewer Work Photos (Customer Connections & Asset info)

  • Photos showing the excavation works

  • Photos showing the sewer connection point on TasWater infrastructure.

  • Photos showing the installation of the pipe work

  • Photos showing the installation of the IO (Inspection Opening)

  • Photos showing backfill of sewer works

  • Photos showing the installation of metallic detector tape

  • Photos showing reinstatement of excavations works including the IO install

  • Was a trafficable IO cover installed

  • Photo showing installation of trafficable IO cover

  • Sewer location details (Customer Connections & Asset info)

  • The measurements from the property boundaries

  • The length (in metres) of the connecting pipework from the main/manhole connection point to the IO.

  • The depth (in millimetres) of the pipe work at the connection point and termination IO for sewer

  • Northerly bearing

  • Was the existing sewer connection relocated?

  • Sewer relocation details - repeat this section for every sewer connection relocation performed (for CIB)
  • Sewer Relocation Details (for CIB)

  • What size was the existing sewer connection?

  • Date of sewer relocation

  • Is sewer installation complete?

  • Serviced Property (e.g. unit 1 or Lot 1)

  • Description of property at time of works being performed?

  • Sewer Work Photos (Customer Connections & Asset info)

  • Photos showing the excavation works

  • Photos showing the installation of the pipe work

  • Photos showing the installation of the IO (Inspection Opening)

  • Photos showing backfill of sewer works

  • Photos showing the installation of metallic detector tape

  • Photos showing reinstatement of excavations works including IO install

  • Was a trafficable IO cover installed

  • Photo showing installation of trafficable IO cover

  • Sewer location details

  • The measurements from the property boundaries

  • The length (in metres) of the connecting pipework from the main/manhole connection point to the IO.

  • The depth (in millimetres) of the pipe work at the connection point and termination IO for sewer

  • Northerly bearing

  • Was a new Maintenance Shaft installed?

  • Photos of new Maintenance Shaft installation - repeat this section for every new Maintenance Shaft installation
  • Maintenance Shaft installation Photos

  • Photos showing the excavation works

  • Photos showing the installation of a new Maintenance Shaft

  • Photos showing the backfill of excavation works

  • Photos showing reinstatement of excavations

  • Maintenance Shaft installation location details

  • The measurements from the property boundaries to the new Maintenance Shaft on TasWater mains.

  • Northerly bearing

  • Was a new Manhole installed?

  • Photos of new Manhole installation - repeat this section for every new Manhole installation
  • Manhole photos

  • Photos showing the excavation works

  • Photos showing the installation of a new manhole

  • Photos showing the backfill of excavation works

  • Photos showing reinstatement

  • Manhole location details

  • The measurements from the property boundaries

  • The measurements from the property boundaries to the new Manhole on TasWater mains.

  • Northerly bearing

  • Was a new Manhole installed?

  • Photos of new Manhole installation - repeat this section for every new Manhole installation
  • Photos showing the excavation works

  • Photos showing the installation of a new manhole

  • Photos showing the backfill of excavation works

  • Photos showing reinstatement

  • Location details of new manhole

  • The measurements from the property boundaries

  • The length (in metres) of the connecting pipework from the mains connection point to the IO.

  • The depth (in millimetres) of the pipe work at the connection point and termination IO for sewer

  • Northerly bearing

AsCons & Endorsed plans

  • Once the Auditor report is complete, please save it as a PDF and combine or add a copy of the Endorsed plans, CCW (Certificate for Certifiable Work *where applicable), signed copy of the MSA Statement of Works & Ascon drawings to the Auditor report. This can be done by saving each document as a separate PDF, then merge all PDF documents together into one combined PDF. Then send that one merge PDF document to Connections@taswater.com.au for processing. Thank you

Panel Member Sign off of Works Completed

  • Full name of Panel Member onsite Supervisor (type full name and sign)

  • Full name of Panel Member onsite Plumber (type full name and sign)

  • Comments

  • Was any loose supply items given to the site contact? e.g. lock & pin

  • Please provide Full Name of person who was given the loose supply items

  • What loose supply item/s where given to site contact?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.