Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Safety
-
PTSP / JHA documented and signed by all Partners?
-
Is PPE per PTSP / JHA being worn (tyvek, hard hat, safety glasses, gloves for PVC, respirator, fall protection, etc.) and in good working condition?
-
Are proper tools available for task, being used correctly, and in good working condition? (Ladders, electrical cords, weld shields, etc.)
-
Clean room work? Proper procedures (smock, barricade, hole covers, etc.)
-
Is work are properly barricaded with WIP signs?<br><br>
-
Is work area free of slips, trips, and falls?
-
Is Lock Out Tag Out required?
-
Is Lock Out procedure onsite and has it been reviewed with all affected Partners? Do all Partners understand what is locked out?
-
Are Lock Out Tag Out isolation points identified, energy dissipation verified, and have LOTO measures been implemented effectively?
-
Has a Corporate Safety Audit been conducted? When?
Quality / Reliability
-
Are project scope documents readily available (Misti drawing, proposal letter, specs)
-
Daily huddle performed at job site? All paperwork up to date and signed daily (PTSP, LOTO, etc.)?
-
Do all Partners understand the scope of work?
-
Has a MISOP or MEI Turnover meeting been conducted?
-
Are work procedures adequate, up to date, and allow for safe completion of task?
-
Is work scope described in the work permit consistent with the work being performed in the field?
-
Are spotters being used in congested areas, and have potential areas of interference been identified and accounted for.
-
Are EMO's covered and labeled within set work zone?
-
Has information been properly passed down from the morning work permit meeting?
-
Have proper actions been taken to minimize risk critical tools as shown on the Big Board?
-
General appearance of work looks level, plumb, and good workmanship?
Productivity
-
Is budget information shared with all Partners?
-
Has one day / five day plan been created and reviewed?
-
Is progress of work accurate with plans?
-
Is progress of work accurate with plans?
-
Material lead time issues?
-
Adequate Partners on the job (too many, too little, properly trained, skill level)?
5S
-
Is 5S being implemented (before, during & after, in the rack)?
-
Is the work area organized (tool storage, tool carts, material staging)?
-
Are labels properly applied?
-
Are all Partners aware and understand 5S?