Title Page

  • Site conducted

  • Site Address
  • Sector

  • Contract Name

  • Date of Audit

  • Name of Auditor(s)

  • Account/Contract Manager

  • Site Supervisor/Engineer

    1. SITE DOCUMENTATION
  • 1.1 Is there a site sign in book for visitors/contractors?

  • 1.2 Are Technical Services contractors inducted on manned sites? (provide evidence)

  • 1.3 Are first aid arrangements in place?

  • 1.4 Are site log book(s) available? (Record types of log books i.e. Fire, Water Compliance, FGas)

  • 1.5 Are log books maintained in a satisfactory condition?

  • 1.6 Are safety posters including MHFA available? Are they displayed on site

2. HOUSEKEEPING

  • 2.1 Are all Technical Services designated areas, clean, tidy and free from a build-up of materials or waste?

  • 2.2 Are areas where Technical Services waste is stored, clean and tidy with refuse bins secure and waste type shown?

  • 2.3 Are Manager / Supervisor audits completed for this site? (Monthly for fixed sites / as agreed by contract for mobile sites)<br>“Use HSF 116B Form on Tech Services QHSE Teams Page”

3. ELECTRICITY

  • 3.1 Is there a current EICR (Fixed Wiring) certificate in place? (Record the date the EICR was carried out)

  • 3.2 Where the EICR is unsatisfactory, have remedial C1 and C2 actions been completed?

  • 3.3 Is there a current PAT certificate for Technical Services portable equipment in place (Record the date the PAT took place)?

  • 3.4 Are electrical switch rooms and other areas with electrical hazards secure with unauthorised access restricted?

  • 3.5 Are switch rooms and other plant rooms with electrical hazards free from a build-up of combustible materials

  • 3.6 Are electrical distribution boards locked to prevent unauthorised access?

  • 3.7 Is signage in place to highlight electrical hazards or areas with electrical hazards?

  • 3.8 Are electric shock posters displayed in areas with electrical hazards?

  • 3.9 Is suitable electrical safety rubber matting in place at electrical risks?

  • 3.10 Does the site have a complex LV electrical system? (i.e. two sources of supply, USB or Generator)

  • 3.11 Where a complex LV electrical system is in place, are Electrical Safety Rules in place and an AE and AP appointed?

  • 3.12 Is there lightning Protection on site. Record date last tested.

4. PLANT AND ASSOCIATED EQUIPMENT

  • 4.1 Are plant rooms locked and secured when not in use?

  • 4.2 Is safety signage displayed at the entrances to plant rooms?

  • 4.3 Are noise levels within plant rooms acceptable?

  • 4.4 Are generators regularly inspected and tested?

  • 4.5 Are eye wash stations in date?

  • Expiry Date

5. FIRE SAFETY

  • 5.1 Does the site have a current Fire Risk Assessment in place?

  • 5.2 Is the fire alarm and detection system tested weekly from a different call point?

  • 5.3 Have fire extinguishers been serviced and tested within the past 12 months (Record date of last service)

  • 5.4 Are Technical Services areas, including plant rooms, free from a build- up combustible materials and sources of fuel?

  • 5.5 Are all emergency escape routes kept free from obstructions and regularly inspected?

  • 5.6 Is emergency lighting inspected/tested on a monthly basis and are remedial actions addressed?

  • 5.7 Has the annual discharge (3hr) emergency lighting test been carried out?

  • 5.8 Have all EL units on site been identified in a schematic drawing or other document and are EL units identifiable?

  • 5.9 Is the fire alarm and detection system tested regularly/ (If contracted by Technical Services, record last service date)

  • 5.10 Are Fire Action Notices displayed within the property and is there a suitable assembly point?

  • 5.11 Does the Fire Alarm panel have a Fire Zone adjacent to the panel?

  • 5.12 Fire compartmentation walls are solid with no obvious gaps in them?

6. LIFTS AND PLATFORM LIFTS

  • 6.1 Are Technical Services responsible for the maintenance of Passenger / Goods or Platform Lifts on this site?<br>(if NO proceed to section 7)

  • 6.2 Have all lifts been the subject of a Thorough Examination (TE) under LOLER at 6 monthly intervals?

  • 6.3 Is there a lift rescue policy in place and are Technical Services engineers aware not to carry out lift rescues?

  • 6.4 Are lift alarms and intercoms tested weekly?

  • 6.5 Are any moving parts protected to prevent entanglements / crush injuries?

7. WORK AT HEIGHT

  • 7.1 Is access to areas where there is a work at height risk suitably controlled? (i.e. roofs, atrium areas etc.)

  • 7.2 Are all fixed ladders inspected annually and safety tags attached?

  • 7.3 Are fixed ladders secured to prevent unauthorised access (i.e. ladder plates)

  • 7.4 Are mobile ladders used on site?

  • 7.5 Are ladders tagged?

8. HAZARDOUS SUBSTANCES

  • 8.1 Have all Gas installations and appliances been inspected in the previous 12 months by a competent engineer?

  • Gas Cert. Date

  • 8.2 Are there any specific hazardous substances stored on this site? (i.e. LPG,)

  • 8.3 Are COSHH Risk Assessments available and controls in place?

  • 8.4 Is there a record of reading that has been signed for by the employees?

9. ASBESTOS

  • 9.1 Is there an asbestos Register available for the site?<br>(If confirmed no ACM’s on site proceed to section 10)

  • 9.2 Do all Technical Services employees have access to the asbestos register, and have they signed the register?

10. WATER HYGIENE

  • 10.1 Is there a current Water Hygiene Risk Assessment in place for the site?

  • 10.2 Does the Risk Assessment contain an asset register and schematic of the water system?

  • 10.3 Are cooling towers registered with the local authority?

  • 10.4 Which contractor provides water hygiene support on this site?

  • 10.5 Are monthly hot and cold tap temperatures recorded and are they satisfactory?

  • 10.6 Is there a water treatment and maintenance regime in place including water sampling?

11. ENVIRONMENTAL

  • 11.1 Do Technical Services maintain air conditioning equipment on this site?

  • 11.2 Where Technical Services maintain A/C equipment is there an FGas register held on site?

  • 11.3 Has the validity of the Waste Carrier’s Licence been checked in the past 12 months?

  • 11.4 Where required is there a spill kit held in Technical Services areas?

12. Concept – Task Specific Risk Assessment

  • 12.1 Are Task Specific Risk Assessment documents fully completed and available in Concept for this contract?

  • 12.2 List the Concept Job Number and name of the operative(s) assigned to the task(s).

  • 12.3 Have relevant and significant hazards for the task(s) been identified on the document by the operative(s)?

  • 12.4 Have suitable control measures for question 12.3 been identified on the document by the operative(s)?

13. CSCS Cards

  • 13.1 Detail the name of the employee (s) or sub contractors along with the CSCS card numbers.

  • Details:

  • 13.2 Check the CSCS card via CSCS Smart Check for validity and record the result.

14. PROJECT WORKS/REFURBISHMENTS

  • 14.1 Are Technical Services carrying out/planning any project / construction or refurbishment works at this site?

  • 14.2 If work is in progress arrange to carry out a separate project site audit.

15. FURTHER COMMENTS

  • Further Comments

SIGN OFF

  • Completed by (Name, Signature & Sign Date)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.